ORS 549.330
Survey of work

  • plats, plans
  • estimates of cost
  • assessment of damages
  • hearing and determination by county court

The county court shall direct the county surveyor, or county engineer if the county employs a registered professional engineer, to make a survey of the work contemplated to be done and prepare plats, plans, profiles and estimates of cost of the work to be done, and shall assess the damage sustained by any person owning any land affected by such improvement, taking into consideration all benefits which will accrue from the work contemplated to be done to the land. The county surveyor, or county engineer, shall file with the county clerk the plats, plans, profiles, estimates of cost, and assessment of damages. Not less than 30 nor more than 60 days after the county surveyor, or county engineer, has filed the data with the county clerk, the county court shall hold a hearing, of which at least 10 days’ notice shall be given to all landowners affected, and to the authority which maintains any highway and to the owners of any railroad or tramway through which or under which any conduit is to be constructed, by publishing the same once a week for two successive weeks in a newspaper of general circulation in the county. At the hearing the county court shall hear evidence in support of the petition and in support of any protest or objection thereto, and after consideration shall determine whether it is to the interest and benefit of the land affected and conducive to the public welfare to grant the petition for the improvement. [Amended by 1965 c.287 §1]

Source: Section 549.330 — Survey of work; plats, plans; estimates of cost; assessment of damages; hearing and determination by county court, https://www.­oregonlegislature.­gov/bills_laws/ors/ors549.­html.

549.010
Definitions for ORS 549.020 and 549.030
549.020
Contracts between counties and federal agencies
549.030
Agreement by two or more counties with federal agency
549.110
Application to county court for authority to build drainage ditch or levee, or to widen or straighten a stream
549.120
Procedure
549.130
Commissioner’s oath
549.140
Duties of commissioners
549.150
Considering benefits in assessing damages
549.160
Report of commissioners to county court
549.170
Appeal to circuit court from assessment of damages
549.180
Bringing additional water into ditch without payment of compensation prohibited
549.190
Other rights protected
549.310
Application of ORS 549.320 to 549.400
549.320
Petition by landowners to drain lands or improve drains
549.330
Survey of work
549.340
Construction
549.350
Report as to work done
549.360
Extension of work across or under highway or railroad
549.370
Maintenance of work
549.380
Acquisition of property necessary to improvement
549.390
Appeal from order authorizing work or assessing damages
549.400
Obstruction, befoulment or pollution of ditch prohibited
549.510
Repair of dikes protecting contiguous tracts of different owners
549.520
Complaint to county judge of neglect to repair
549.530
Entry on land by complainant to repair dike
549.540
Dikes constructed under agreement excepted
549.605
Definitions for ORS 549.605 to 549.645
549.610
Water Resources Commission to participate on behalf of state in federal flood control projects
549.615
Entering upon land
549.620
Acquisition of property
549.625
Powers of commission with respect to acquired property
549.630
Operation and maintenance of projects
549.635
Agreements for joint participation or aid
549.640
Disposition of moneys received by commission
549.645
Waiver of state’s immunity to suit or action
549.710
Powers of counties with populations in excess of 50,000
549.720
Procedure for removing or destroying drifts and drifting materials
549.730
Budgeting and appropriating money for water conservation and flood control
549.990
Penalties
Green check means up to date. Up to date