OAR 123-046-0080
Tide Gate Planning Project Application Eligibility Criteria


The Department will determine tide gate planning project application eligibility using criteria including but not limited to the following:
(1) The application must demonstrate that the study scope will include all elements needed to develop a shovel ready tide gate project consistent with OAR 123-046-0060 (Tide Gate Construction Project Application Eligibility Criteria)(1).
(2) All required permits and regulatory authorizations must be addressed through the study scope.
(3) The study scope must result in feasibility documentation consistent with OAR 123-046-0060 (Tide Gate Construction Project Application Eligibility Criteria)(2).
(4) The study scope must include a plan to communicate with all impacted landowners throughout the course of the planning project.

Source: Rule 123-046-0080 — Tide Gate Planning Project Application Eligibility Criteria, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=123-046-0080.