OAR 340-071-0140
Onsite System Fees


(1) This rule establishes the fees for site evaluations, permits, reports, variances, licenses, and other services DEQ provides under this division.
(2) Table 9A lists the site evaluation and existing system evaluation fees. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(3) Tables 9B and 9C list the permitting fees for systems not subject to WPCF permits. Online submittals for annual report evaluation fees may apply when DEQ implements online reporting. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(4) WPCF permit fees. Fees in this section apply to WPCF permits issued under OAR 340-071-0162 (Permit Application Procedures — WPCF Permits). Table 9D lists the WPCF permit fees. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(5) Table 9F lists the innovative, Alternative Technology and Material Plan Review fees. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(6) Table 9E lists the Sewage Disposal Service License and Truck Inspection fees. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(7) Compliance Recovery Fee. When a violation results in an application in order to comply with the requirements in this division, the agent may require the applicant to pay a compliance recovery fee in addition to the application fee. The amount of the compliance recovery fee shall not exceed the application fee. Such violations include but are not limited to installing a system without a permit, performing sewage disposal services without a license, or failure to obtain an authorization notice when it is required.
(8) Land Use Review Fee. Land use review fees are listed in Table 9C and are assessed when an agent review is required in association with a land use action or building permit application and no approval is otherwise required in the division. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(9) Contract county fee schedules.
(a) Each county having an agreement with DEQ under ORS 454.725 (Contracts with local governments) must adopt a fee schedule for services rendered and permits issued. The county fee schedule may not include DEQ’s surcharge established in section (10) of this rule unless identified as a DEQ surcharge.
(b) The county must submit a copy of the fee schedule and any subsequent amendments to the schedule to DEQ.
(c) Fees may not exceed actual costs for efficiently conducted services.
(10) DEQ surcharge.
(a) To offset a portion of the administrative and program oversight costs of the statewide onsite wastewater management program, DEQ and contract counties must levy a surcharge for each site evaluation, report permit, and other activity for which an application is required in this division. The surcharge fee is listed in Table 9F. This surcharge does not apply to pumper truck inspections, annual report evaluation fees, or certification of installers or maintenance providers. [NOTE: All tables are found in OAR 340-071-0800 (Tables).]
(b) Proceeds from surcharges DEQ and contract counties collect must be accounted for separately. Each contract county must forward the proceeds to DEQ under its agreement with the DEQ.
(11) Refunds. DEQ may refund all or a portion of a fee accompanying an application if the applicant withdraws the application before any field work or other substantial review of the application has been done.
[NOTE: All tables are found in OAR 340-071-0800 (Tables).]
340–071–0100
Definitions
340–071–0110
Purpose
340–071–0115
Technical Review Committee
340–071–0120
Jurisdiction and Policy
340–071–0130
General Standards, Prohibitions and Requirements
340–071–0135
Approval of New or Innovative Technologies, Materials, or Designs for Onsite Systems
340–071–0140
Onsite System Fees
340–071–0150
Site Evaluation Procedures
340–071–0155
Existing System Evaluation Report
340–071–0160
Permit Application Procedures — Construction, Installation, Alteration, and Repair Permits
340–071–0162
Permit Application Procedures — WPCF Permits
340–071–0165
Permit Denial Review — Construction-Installation, Repair, Alteration Permits
340–071–0170
Pre-Cover Inspections
340–071–0175
Certificate of Satisfactory Completion
340–071–0185
Decommissioning of Systems
340–071–0200
Prior Construction Permits or Approvals
340–071–0205
Authorization to Use Existing Systems
340–071–0210
Alteration of Existing Onsite Wastewater Treatment Systems
340–071–0215
Repair of Existing Systems
340–071–0220
Standard Subsurface Systems
340–071–0260
Alternative Systems, General
340–071–0265
Capping Fills
340–071–0275
Pressurized Distribution Systems
340–071–0280
Seepage Trench System
340–071–0285
Redundant Systems
340–071–0290
Conventional Sand Filter Systems
340–071–0295
Conventional Sand Filter Design and Construction
340–071–0302
Recirculating Gravel Filter (RGF)
340–071–0310
Steep Slope Systems
340–071–0315
Tile Dewatering System
340–071–0320
Split Waste Method
340–071–0325
Gray Water Waste Disposal Sumps
340–071–0330
Nonwater-Carried Systems
340–071–0335
Cesspools and Seepage Pits
340–071–0340
Holding Tanks
340–071–0345
Alternative Treatment Technologies (ATTs)
340–071–0360
Absorption Trenches in Saprolite
340–071–0400
Geographic Area Special Considerations.
340–071–0410
Rural Area Consideration
340–071–0415
For Cause Variances
340–071–0420
Hardship Variances
340–071–0425
Variance Officers
340–071–0430
Variance Hearings and Decisions
340–071–0435
Variance Permit Issuance, Inspections, Certificate of Satisfactory Completion
340–071–0440
Variance Appeals
340–071–0445
Variance Administrative Review
340–071–0460
Moratorium Areas
340–071–0500
Community Systems
340–071–0520
Large Systems
340–071–0600
Sewage Disposal Service Licenses
340–071–0650
Training and Certification Requirements for System Installers and Maintenance Providers
340–071–0800
Tables
Last Updated

Jun. 8, 2021

Rule 340-071-0140’s source at or​.us