OAR 340-090-0070
Principal Recyclable Material
(1)
The following are identified as the principal recyclable materials in the wastesheds as described in sections (4) through (12) of this rule:(a)
Newspaper;(b)
Ferrous scrap metal;(c)
Non-ferrous scrap metal;(d)
Used motor oil;(e)
Corrugated cardboard and kraft paper;(f)
Aluminum;(g)
Container glass;(h)
Hi-grade office paper;(i)
Tin cans;(j)
Yard debris.(2)
In addition to the principal recyclable materials listed in section (1) of this rule, other materials may be recyclable material at specific locations where the opportunity to recycle is required.(3)
The statutory definition of “recyclable material” (ORS 459.005 (Definitions for ORS 459.005 to 459.437, 459.705 to 459.790 and 459A.005 to 459A.665)(31)) determines whether a material is a recyclable material at a specific location where the opportunity to recycle is required.(4)
In the following wasteshed, Clackamas, Washington and Multnomah counties in aggregate the principal recyclable materials are those listed in subsections (1)(a) through (j) of this rule.(5)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(a) through (i) of this rule:(a)
Benton wasteshed;(b)
Clatsop wasteshed;(c)
Hood River wasteshed;(d)
Lane wasteshed;(e)
Lincoln wasteshed;(f)
Linn wasteshed;(g)
Marion wasteshed;(h)
Polk wasteshed;(i)
Umatilla wasteshed;(j)
Union wasteshed;(k)
Wasco wasteshed;(l)
Yamhill wasteshed.(6)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(a) through (g) of this rule:(a)
Baker wasteshed;(b)
Crook wasteshed;(c)
Jefferson wasteshed;(d)
Klamath wasteshed;(e)
Tillamook wasteshed.(7)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(a) through (h) of this rule:(a)
Coos wasteshed;(b)
Deschutes wasteshed;(c)
Douglas wasteshed;(d)
Jackson wasteshed;(e)
Josephine wasteshed.(8)
In the following wasteshed, the principal recyclable materials are those listed in subsections (1)(a) through (f) of this rule: Malheur wasteshed.(9)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(a) through (g) and (i) of this rule:(a)
Columbia wasteshed;(b)
Milton-Freewater wasteshed.(10)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(a) through (e) of this rule:(a)
Curry wasteshed;(b)
Grant wasteshed;(c)
Harney wasteshed;(d)
Lake wasteshed.(11)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(a) through (d) of this rule:(a)
Morrow wasteshed;(b)
Sherman wasteshed;(c)
Wallowa wasteshed.(12)
In the following wastesheds, the principal recyclable materials are those listed in subsections (1)(b) through (d) of this rule:(a)
Gilliam wasteshed;(b)
Wheeler wasteshed.(13)
Intentionally left blank —Ed.(a)
The opportunity to recycle must be provided for each of the principal recyclable materials listed in sections (4) through (12) of this rule and for other materials which meet the statutory definition of recyclable material at specific locations where the opportunity to recycle is required;(b)
The opportunity to recycle is not required for any material that a recycling report, as required in OAR 340-090-0100 (Reporting Requirements), and approved by the DEQ demonstrates does not meet the definition of recyclable material for the specific location where the opportunity to recycle is required.(14)
Each city, county or metropolitan service district in a wasteshed where yard debris is a principal recyclable material must individually, or jointly through intergovernmental agreement, implement a program that at a minimum meets the requirements of OAR 340-090-0030 (General Requirements) when the option under OAR 340-090-0040 (Local Government Recycling Program Elements)(3)(e) is not chosen or request approval of an alternative program for providing the opportunity to recycle under OAR 340-090-0080 (Alternative Methods for Providing the Opportunity to Recycle).(15)
Any affected person may ask the EQC to modify the list of principal recyclable material identified by the EQC or may request a variance under ORS 459A.055 (Variance or request for extension to provide opportunity to recycle).(16)
DEQ will review the principal recyclable material lists as needed, and will submit any proposed changes to the EQC.
Source:
Rule 340-090-0070 — Principal Recyclable Material, https://secure.sos.state.or.us/oard/view.action?ruleNumber=340-090-0070
.