OAR 629-630-0200
Landings


(1)

Operators shall minimize the size of landings to that necessary for safe operation.

(2)

Operators shall locate landings on stable areas so as to minimize the risk of material entering waters of the state.

(3)

Operators shall avoid locating landings in riparian management areas. When no feasible alternative landing locations exist, operators shall submit a written plan to the State Forester before locating landings in riparian management areas.

(4)

Operators shall not incorporate slash, logs, or other large quantities of organic material into landing fills.

(5)

Operators shall deposit excess material from landing construction in stable locations well above the high water level.
Last Updated

Jun. 8, 2021

Rule 629-630-0200’s source at or​.us