OAR 632-010-0012
Modifications to Drilling Permits


Proposed modifications to a drilling permit must be approved by the department prior to taking effect.

(1)

Modification to a permit involving depth, casing, or location within the same drilling or spacing unit must be submitted on an application form provided by the department, along with the applicable fee. (2) A modification of location to a different drilling or spacing unit requires a new application and fee, and may constitute a significant modification for land use purposes.

(3)

The Permittee may not transfer the permit without written approval from the department. The department may transfer a permit to a new owner or operator if the following items are provided to the department:

(a)

A completed application signed by the original permittee and the new permittee;

(b)

A bond or alternative form of security acceptable to the department in the name of the new permittee; and

(c)

-A new organization report.

(4)

Deepening: A permittee must obtain written approval from the department before a well may be drilled to a depth below the maximum depth specified in the permit. To obtain approval, the permittee must file a written application that describes the present condition of the well, including the complete casing record, and the proposed work, including the plan for sealing off any oil, gas, brine, or fresh-water strata to be found or expected to be found in the deepening, and the new proposed total depth. If the method set forth is satisfactory and the permittee is not in violation of ORS chapter 520, the board’s rules implementing that chapter or the orders of the board, the department, the department may approve a permit modification. The permittee may not begin the actual deepening of the well until the modified permit has been posted at the well location.

Source: Rule 632-010-0012 — Modifications to Drilling Permits, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=632-010-0012.

632‑010‑0002
General Rules
632‑010‑0004
Supremacy of Special Rules
632‑010‑0008
Definitions
632‑010‑0010
Application and Permit to Drill, Redrill, Deepen, Alter Casing, or Rework
632‑010‑0011
Active Permits
632‑010‑0012
Modifications to Drilling Permits
632‑010‑0014
Drilling Practices
632‑010‑0015
Down Hole Loss and Decommissioning of a Radioactive Source
632‑010‑0016
Enclosure and Identification of Wells, Tanks, and Other Oil Measuring Devices
632‑010‑0017
Well Records (Logs)
632‑010‑0018
Organization Reports
632‑010‑0020
Surface Equipment
632‑010‑0128
Boiler or Light Plant
632‑010‑0130
Rubbish or Debris
632‑010‑0132
Tubing
632‑010‑0134
Chokes
632‑010‑0136
Separators
632‑010‑0138
Fire Walls
632‑010‑0140
Reserve Pits, Sumps, and Above-Ground Tanks
632‑010‑0142
Directional Drilling
632‑010‑0144
Report of Perforating or Well Stimulation Treatment
632‑010‑0146
Vacuum Pumps Prohibited
632‑010‑0148
Production Practice
632‑010‑0150
Removal Of Casing
632‑010‑0151
Notification of Fire, Breaks, Leaks, or Blowouts
632‑010‑0152
Multiple Completion of Wells
632‑010‑0154
Determining and Naming Fields and Pools
632‑010‑0156
Spacing Units, Notification
632‑010‑0157
Exceptions to Special Rules
632‑010‑0159
Underground Reservoirs for Natural Gas Storage
632‑010‑0161
Compulsory Integration Orders
632‑010‑0162
Illegal Production
632‑010‑0163
Limitation of Production
632‑010‑0164
Commingling of Production Prohibited
632‑010‑0165
Allocation of Gas Pursuant to Special Pool Rules
632‑010‑0166
Reports by Purchasers and Producers
632‑010‑0167
Maximum Efficient Rate Hearings
632‑010‑0168
Use of Earthen Reservoirs
632‑010‑0170
Reservoir Surveys
632‑010‑0172
Operators to Assist in Reservoir Surveys
632‑010‑0174
Measurement of Potential Open-Flow of Gas Wells
632‑010‑0176
Supervision of Open-Flow and Pressure Tests
632‑010‑0178
Duration of Tests
632‑010‑0182
Gas to Be Metered
632‑010‑0184
Direct Well Pressure
632‑010‑0186
Gas-Oil Ratio
632‑010‑0188
Gas-Oil Ratio Surveys and Reports
632‑010‑0190
Gas Utilization
632‑010‑0192
Disposal of Brine or Salt Water
632‑010‑0194
Water Injection and Water Flooding of Oil and Gas Properties
632‑010‑0196
Gas Injection of Oil and Gas Properties
632‑010‑0198
Abandonment, Unlawful Abandonment, Suspension, Well Plugging
632‑010‑0205
Drilling Surety Bond
632‑010‑0210
Disposal of Solid and Liquid Wastes
632‑010‑0220
Measurement of Oil
632‑010‑0225
Spacing Plan
632‑010‑0230
Location of Wells
632‑010‑0235
Exceptions
Last Updated

Jun. 8, 2021

Rule 632-010-0012’s source at or​.us