OAR 635-042-0001
Management and Catch Reporting Areas
(1)
Zone 1 is easterly of a line projected from the knuckle of the south jetty on the Oregon bank to the inshore end of the north jetty on the Washington bank, and westerly of a line projected from a beacon light at Grays Point on the Washington bank to the flashing 4-second red buoy “44” off the easterly tip of Tongue Point on the Oregon bank.(2)
Zone 2 is easterly of a line projected from a beacon light at Grays Point on the Washington bank to the flashing 4-second red buoy “44” off the easterly tip of Tongue Point on the Oregon bank, and westerly of a line projected from the 4-second flashing green light “81” on the Washington bank to a boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, including all waters of Grays Bay, those waters of Deep River downstream of the Highway 4 Bridge, all waters of Seal Slough, those waters of Grays River downstream of a line projected between fishing boundary markers on both banks at the Leo Reisticka farm, and those waters of Elokomin Slough and Elokomin River downstream of the Highway 4 Bridge.(3)
Zone 3 is easterly of a line projected from the 4-second flashing green light “81” on the Washington bank to a boundary marker on the easterly end of the Beaver Terminal Pier in Oregon, and westerly of a line projected true west from the east or upstream bank of the Lewis River mouth in Washington.(4)
Zone 4 is easterly of a line projected true west from the east or upstream bank of the Lewis River in Washington, and westerly of a line projected true north from Rooster Rock on the Oregon bank, and those waters of Camas Slough downstream of the western most powerline crossing at the James River Mill.(5)
Zone 5 is easterly of a line projected true north from Rooster Rock on the Oregon bank, and westerly of a line projected from a deadline marker on the Oregon bank (approximately four miles downstream from Bonneville Dam Powerhouse 1) in a straight line through the western tip of Pierce Island, to a deadline marker on the Washington bank at Beacon Rock.(6)
Area 2S is from a downstream boundary of a true north/south line through flashing red 4-second light “50” near the Oregon bank to an upstream boundary of a straight line from a deadline marker on the Oregon bank (approximately four miles downstream from Bonneville Dam Powerhouse 1) through the western tip of Pierce Island, to a deadline marker on the Washington bank at Beacon Rock.
Source:
Rule 635-042-0001 — Management and Catch Reporting Areas, https://secure.sos.state.or.us/oard/view.action?ruleNumber=635-042-0001
.