OAR 690-210-0400
Construction of Dug Wells


Dug wells that are 21 feet or less in depth shall be sealed with grout from land surface to within three feet of the bottom of the well. Dug wells greater than 21 feet in depth shall be sealed with grout from land surface to a depth of at least 18 feet below land surface. In all cases a watertight surface curbing shall extend from a minimum of 12 inches above land surface and continue the entire length of the sealed interval. Open wells, sometimes called sumps, which exceed ten feet in average diameter and are dug to a depth of ten feet or less are exempt from these construction requirements, but are subject to all the requirements covering the use of ground water (water right application).

Source: Rule 690-210-0400 — Construction of Dug Wells, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=690-210-0400.

690‑210‑0005
Standards Apply to all Methods of Well Construction
690‑210‑0030
Placement of Water Supply Wells
690‑210‑0060
Explosives
690‑210‑0065
Hydrofracturing
690‑210‑0070
Injection Wells
690‑210‑0100
Mineralized or Contaminated Groundwater
690‑210‑0130
Sealing of Wells in Unconsolidated Formations Without Significant Clay Beds
690‑210‑0140
Sealing of Water Supply Wells in Unconsolidated Formations with Significant Clay Beds
690‑210‑0150
Sealing of Water Supply Wells in Consolidated Formations
690‑210‑0155
Additional Standards for Artesian Water Supply Wells
690‑210‑0160
Additional Standards for Filter Pack Wells with Surface Casing
690‑210‑0170
Additional Standards for Filter Pack Wells without Surface Casing
690‑210‑0180
Additional Standards for Driven or Jetted Wells
690‑210‑0190
Steel Casing
690‑210‑0200
Steel Casing Joints
690‑210‑0210
Plastic Casing
690‑210‑0220
Plastic Casing Joints
690‑210‑0230
Inner Casing
690‑210‑0240
Casing Shall be Centered
690‑210‑0250
Top Terminal Height
690‑210‑0260
Openings in the Casing
690‑210‑0270
Pitless Well Adapters and Units
690‑210‑0280
Access Ports, Dedicated Measuring Tubes and Airlines
690‑210‑0290
Liner Pipe
690‑210‑0300
Drill Cuttings or Chips
690‑210‑0310
Cement Grout
690‑210‑0315
Concrete
690‑210‑0320
Methods of Placement of Cement Grout or Concrete
690‑210‑0330
Unhydrated Bentonite
690‑210‑0340
Method of Placement of Unhydrated Bentonite
690‑210‑0350
Resumption of Construction Following Placement of Cement Grout
690‑210‑0360
Movement of Casing after Cement Grouting
690‑210‑0370
Well Test
690‑210‑0380
Disinfection of a Well
690‑210‑0390
Completion of Wells
690‑210‑0400
Construction of Dug Wells
690‑210‑0410
Buried Slab Construction
690‑210‑0420
Surface Curbing
Last Updated

Jun. 8, 2021

Rule 690-210-0400’s source at or​.us