OAR 690-240-0340
Landowner Well Construction Permit, Fee and Bond


(1)

The Water Resources Commission requires a permit, permit fee, and bond or irrevocable letter of credit, for each monitoring well constructed, altered, converted, or abandoned by a landowner, unless the landowner is a licensed and bonded Monitoring Well Constructor. The landowner permit and bond shall be obtained prior to beginning work on a well.

(2)

To receive a Landowner Well permit, a person must submit the following to the Director:

(a)

A completed application form provided by the Commission, containing, as a minimum:

(A)

The property owner’s name, address and telephone number;

(B)

The surety company’s name, address and telephone number;

(C)

The proposed location of the well by township, range, section, tax-lot number if assigned, and street address;

(D)

The proposed use of the monitor well; and

(E)

The type of proposed work; and

(F)

Well design plan on form approved by the Department.

(b)

A properly executed Landowner’s Water Well Bond or Irrevocable Letter of Credit in the amount specified under ORS 537.753 (Bond or letter of credit) to the State of Oregon; and

(c)

A permit fee in the amount specified under ORS 537.753 (Bond or letter of credit).

(3)

Only the owner of record, a member of the immediate family of the owner of record, or a full time employee of the owner of record, (whose main duties are other than the construction of wells), may operate a well drilling machine under a landowner’s permit.

(4)

A landowner permit issued pursuant to these rules shall expire six months from the date of issuance.

(a)

A monitor well report shall be submitted within 30 days of expiration of the landowner permit, or within 30 days of completion of the well, whichever occurs first.

(5)

If the landowner permit expires, a landowner may reapply for a new landowner permit by complying with the requirements described in sections (1), (2) and (3) of this rule.

(6)

The Department may deny a landowner permit if it is determined that the construction, alteration, abandonment, or conversion of the proposed well is a health threat, a health hazard, a source of contamination, or a source of waste of the ground water resource.

Source: Rule 690-240-0340 — Landowner Well Construction Permit, Fee and Bond, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=690-240-0340.

690‑240‑0005
Introduction
690‑240‑0006
Special Standards
690‑240‑0007
Special Area Standards
690‑240‑0010
Definitions
690‑240‑0011
Organic Materials
690‑240‑0012
Public Safety
690‑240‑0013
Wells Cannot Be Used for Disposal of Contaminants
690‑240‑0014
Water Used Must be Potable
690‑240‑0015
Delegation of Responsibility for Monitoring Wells, Geotechnical Holes and Other Holes
690‑240‑0016
Unattended Wells
690‑240‑0020
Delegation Conditions
690‑240‑0024
Well Identification Label
690‑240‑0026
Well Identification Label Maintenance
690‑240‑0030
Other Holes: General Performance and Responsibility Requirements
690‑240‑0035
Geotechnical Holes: General Performance and Responsibility Requirements
690‑240‑0040
Closed Loop Ground Source Heat Pump Boring — General Requirements
690‑240‑0043
Construction Standards
690‑240‑0046
Grouting of Uncased Boring
690‑240‑0049
Reporting Requirements
690‑240‑0055
License Required to Construct Monitoring Wells
690‑240‑0060
Monitoring Well Constructor License Examination
690‑240‑0065
Monitoring Well Constructor License, Experience Requirements and Trainee Card
690‑240‑0070
Terms of Monitoring Well Constructor License and License Fees
690‑240‑0200
Continuing Education Committee
690‑240‑0210
Continuing Education Requirement
690‑240‑0220
Documentation
690‑240‑0240
Approved Course List/Course Approval and Assignment of CECs
690‑240‑0250
Course Sponsor Requirements
690‑240‑0260
Loss of Approval
690‑240‑0270
Courses Taken Without Prior Approval
690‑240‑0280
Waivers
690‑240‑0320
Contracting for Services
690‑240‑0330
Monitoring Well Constructor and Landowner Well Bonds or Letters of Credit
690‑240‑0340
Landowner Well Construction Permit, Fee and Bond
690‑240‑0355
Monitoring Well Drilling Machines
690‑240‑0375
Monitoring Well Construction Notice Required (Start Card)
690‑240‑0385
Start Card Reporting Requirements
690‑240‑0395
Monitoring Well Report Required (Monitoring Well Log)
690‑240‑0410
Monitoring Well Construction: General
690‑240‑0420
Well Protection
690‑240‑0430
Casing
690‑240‑0440
Additional Standards for Artesian Monitoring Wells
690‑240‑0450
Cleaning
690‑240‑0460
Monitoring Well Screen, Filter Pack, and Filter Pack Seal
690‑240‑0475
Well Seals
690‑240‑0485
Monitoring Well Development
690‑240‑0500
Completion of Monitoring Wells
690‑240‑0510
Abandonment of Monitoring Wells
690‑240‑0525
Piezometers
690‑240‑0540
Direct Push Monitoring Wells and Piezometers
690‑240‑0550
Evidence of Failure
690‑240‑0560
Investigation of Alleged Violations
690‑240‑0580
Enforcement Actions
690‑240‑0590
Multiple Violations and Consolidation of Proceedings
690‑240‑0600
Factors Affecting Selection of Type and Degree of Enforcement
690‑240‑0610
Change in Enforcement Status
690‑240‑0630
Assessment of Civil Penalties
690‑240‑0640
Schedule of Civil Penalties
Last Updated

Jun. 8, 2021

Rule 690-240-0340’s source at or​.us