OAR 860-039-0025
Application for Net Metering Interconnection


(1)

An application for interconnection review will be submitted on a standard form, available from the public utility and posted on the public utility’s website. The application form will require the following types of information:

(a)

The name of the applicant and the public utility involved;

(b)

The type and specifications of the net metering facility;

(c)

The level of interconnection review sought; e.g., Level 1, Level 2 or Level 3;

(d)

The contractor who will install the net metering facility;

(e)

Equipment certifications;

(f)

The anticipated date the net metering facility will be operational; and

(g)

Other information that the utility deems is necessary to determine compliance with these net metering rules.

(2)

Within three business days after receiving an application for Level 1 or Level 2 interconnection review, the public utility will provide written or electronic mail notice to the applicant that it received the application and whether the application is complete. If the application is incomplete, the written notice will include a list of all of the information needed to complete the application.

(3)

An applicant will retain its original queue position for an interconnection request if the applicant resubmits its application at a higher level of review within 30 business days of a utility’s denial of the application at a lower level of review.

(4)

Each public utility will designate an employee or office from which an applicant can obtain basic application forms and information through an informal process. On request, the public utility must provide all relevant forms, documents, and technical requirements for submittal of a complete application for interconnection review under these net metering rules, as well as specific information necessary to contact the public utility representatives assigned to review the application.

(5)

On request, the public utility must meet with an applicant who qualifies for Level 2 or Level 3 interconnection review to assist them in preparing the application.

(6)

A public utility will not be responsible for the cost of determining the rating of equipment owned by a customer-generator or of equipment owned by other local customers.

(7)

At the time of application, an applicant may choose to simultaneously submit an executed public utility’s standard form interconnection agreement.

Source: Rule 860-039-0025 — Application for Net Metering Interconnection, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=860-039-0025.

Last Updated

Jun. 8, 2021

Rule 860-039-0025’s source at or​.us