OAR 860-082-0040
Insurance


(1)

A public utility may not require an applicant or an interconnection customer with a small generator facility with a nameplate capacity of 200 kilowatts or less to obtain liability insurance in order to interconnect with the public utility’s transmission or distribution system.

(2)

A public utility may require an applicant or an interconnection customer with a small generator facility with a nameplate capacity greater than 200 kilowatts to obtain prudent amounts of general liability insurance in order to interconnect to the public utility’s transmission or distribution system.