OAR 918-500-0410
Inspection Request


(1)

Requests for inspection from a manufacturer must:

(a)

Be made to the division by mail, electronic mail, phone, or fax transmittal, and received at least five working days prior to the desired time of inspection; and

(b)

Indicate the serial number of the manufactured dwelling to be inspected. Inspection fees must be paid by the manufacturer within 30 days of the billing date.

(2)

Requests for inspection from a dealer must:

(a)

Be made on forms supplied by the division, and received at least five working days prior to the desired date of inspection;

(b)

Indicate the location, make, model, and serial number of the manufactured dwelling; and

(c)

Be accompanied by the minimum inspection fees required by OAR 918-500-0100 (General Fees) and 918-500-0110 (Additional Fees). All additional inspection fees are payable upon completion of each inspection.

(3)

All work must be accessible for inspection by the division.

(4)

Occupancy may not prevent the physical inspection of manufactured dwelling alterations, repairs, or installations.
Last Updated

Jun. 8, 2021

Rule 918-500-0410’s source at or​.us