OAR 918-515-0150
Manufactured Dwelling Installer License Requirements
(1)
An installer must:(a)
Work for a business with a valid Construction Contractors Board license; or(b)
The installer is a business with a valid Construction Contractors Board license.(2)
Work covered by an installer’s license is limited to:(a)
Preparing the site and stand for the installation of the manufactured dwelling or cabana;(b)
Installing manufactured dwellings, cabanas, skirting, underfloor vapor retarder, ventilation, access, and temporary steps;(c)
Installing the support, tie-down, ERB’s, and the structural connections for manufactured dwellings and cabanas;(d)
Providing setbacks, clearances, and fire life and safety protection;(e)
Providing plumbing and electrical utility connections;(f)
Providing plumbing, electrical, and mechanical crossover, appliance, and fixture connections of and to the manufactured dwelling or cabana as permitted by these rules;(g)
Install appliance exhaust ducts and terminations when required;(h)
Performing plumbing, mechanical, and electrical tests when required; and(i)
Serving as the supervisor of individuals licensed by the division as limited installers.(3)
An installer must, at a minimum:(a)
Assure the manufactured dwelling or cabana stand is in compliance with the Oregon Manufactured Dwelling Installation Specialty Code prior to the installation of the manufactured dwelling or cabana;(b)
Assure all setbacks, clearances, and fire life and safety installations are in compliance with the Oregon Manufactured Dwelling Installation Specialty Code;(c)
Perform electrical and plumbing tests if the respective plumbing and electrical connections were made by the installer;(d)
Close and secure all access panels and covers on or under the manufactured dwelling or cabana;(e)
Assure the underfloor dryer and range exhaust ducts are roughed in if the manufactured dwelling is equipped with or provides for the installation of such an appliance requiring exhaust ducts;(f)
Assure that all doors and windows are adjusted, secured in place, and operational;(g)
Assure all ship-loose flue vents and chimneys are installed, secured in place, and capped according to their listing;(h)
Where the installer also installs the skirting, comply with OAR 918-515-0490 (Limited Skirting Installer Responsibilities to Consumer)(1);(i)
Affix a certification tag to each manufactured dwelling or cabana installed;(j)
Complete all reporting and application forms required by these rules; and(k)
Leave the manufacturer’s installation instructions at the installation site to be available at the time of the inspection if used for any part of the installation;(l)
Assure all portions of the manufactured dwelling installation performed by the installer are in compliance with the Oregon Manufactured Dwelling Installation Specialty Code ; and(m)
Correct all applicable nonconformances within 30 days of receipt of a correction notice .