ORS 197A.500
Definitions for ORS 197A.500 to 197A.521


As used in ORS 197A.500 (Definitions for ORS 197A.500 to 197A.521) to 197A.521 (Failure to meet timeline), unless the context requires otherwise:

(1)

“Affected local governments” means the cities and the counties within which the project improvements will be located.

(2)

“Criteria” means the land use criteria established by the Land Conservation and Development Commission as provided in ORS 197A.505 (Establishment of criteria for decisions in land use final order).

(3)

“Development approval” means approval of a proposed development of land based on discretionary standards designed to regulate the physical characteristics of a use permitted outright, including but not limited to site review and design review.

(4)

“Draft Statement” means the Draft Environmental Impact Statement for the project, as may be amended from time to time, and any supplementary assessments or statements prepared pursuant to regulations implementing the National Environmental Policy Act, 42 U.S.C. 4321 et seq.

(5)

“Final Statement” means the Environmental Impact Statement for the project, as may be amended from time to time, or any supplementary assessments or statements, prepared pursuant to regulations implementing the National Environmental Policy Act, 42 U.S.C. 4321 et seq.

(6)

“Full Funding Grant Agreement” means the contractual agreement entered into between the federal government and the local grant recipient establishing the maximum federal financing contribution for construction of the project and setting forth terms, conditions and limitations for federal financing of the project.

(7)

“Highway improvements” means improvements to the highway, street and other ancillary facilities for the project and improvements related to construction or operation of the project. As used in this subsection:

(a)

“Ancillary facilities” includes retaining walls, bridges, signals, electrification equipment, lighting equipment, staging areas, facilities for bus or rail travel, stormwater facilities, wetland mitigation facilities and facilities designed for vehicle, pedestrian and bicycle traffic.

(b)

“Improvement” includes any development or alteration to land related to the project.

(8)

“Land use final order” means a written order or orders of the Metro Council deciding the project improvements for the project, including their locations.

(9)

“Light rail route” means the light rail alignment selected from among light rail alignment alternatives described in a Draft Statement or Final Statement to be included in the project.

(10)

“Locally Preferred Alternative Report” means a decision adopted in accordance with federal requirements determining or amending an earlier decision whether or not to build the Southwest Corridor MAX Light Rail Project and, if the decision adopted is to build, recommending the project improvements, including their locations, to be included in the Southwest Corridor MAX Light Rail Project.

(11)

“Locations” means the boundaries within which the project improvements will be located.

(12)

“Measures” includes any mitigation measures, design features or other amenities or improvements associated with the project.

(13)

“Metro Council” means the elected governing body of Metro.

(14)

“Project” means the portion of the Southwest Corridor MAX Light Rail Project within Metro’s urban growth boundary. “Project” includes:

(a)

All project improvements described in the Locally Preferred Alternative Report, as may be amended from time to time by a Draft Statement, Final Statement, Full Funding Grant Agreement or similar document for the Southwest Corridor MAX Light Rail Project; and

(b)

All phases and extensions of the Southwest Corridor MAX Light Rail Project as described in a Locally Preferred Alternative Report, Draft Statement, Final Statement, Full Funding Grant Agreement or similar document.

(15)

“Project improvements” means the light rail route, stations, lots and maintenance facilities and the highway improvements related to the project as described in the Locally Preferred Alternative Report, as may be amended from time to time by a Draft Statement, Final Statement, Full Funding Grant Agreement or similar document for the Southwest Corridor MAX Light Rail Project.

(16)

“Stations, lots and maintenance facilities” means the light rail stations, light rail park-and-ride lots and light rail vehicle maintenance facilities to be selected from among alternatives described in a Draft Statement, Final Statement or similar document to be included in the project.

(17)

“TriMet” means the Tri-County Metropolitan Transportation District of Oregon, a mass transit district created under ORS chapter 267. [2017 c.714 §1]
Note: 197A.500 (Definitions for ORS 197A.500 to 197A.521) to 197A.521 (Failure to meet timeline) were enacted into law by the Legislative Assembly but were not added to or made a part of ORS chapter 197A or any series therein by legislative action. See Preface to Oregon Revised Statutes for further explanation.

Source: Section 197A.500 — Definitions for ORS 197A.500 to 197A.521, https://www.­oregonlegislature.­gov/bills_laws/ors/ors197A.­html (accessed May 26, 2025).

197A.015
Definitions for ORS 197.475 to 197.493 and ORS chapter 197A
197A.018
Definition of “needed housing.”
197A.020
Limitations on requiring contribution for government assisted housing
197A.025
Policy
197A.030
Department support to local governments to incentivize needed housing
197A.100
Housing production strategy
197A.103
Review of housing production strategy
197A.110
City report on housing permitting and production
197A.115
City report on implementation of housing production strategy
197A.130
Identification of cities with unmet housing needs
197A.200
Local government planning for needed housing
197A.205
Housing and Community Services Department review of certain local housing measures
197A.210
Development-ready lands
197A.215
Application to remove property from within urban growth boundary
197A.230
Definitions for ORS 197A.230 to 197A.250
197A.232
Findings regarding long-range planning
197A.235
Designation of rural and urban reserves pursuant to intergovernmental agreement
197A.242
Coordinated and concurrent process for designation of urban and rural reserves
197A.245
Urban reserves
197A.250
Designation of certain Washington County lands
197A.270
Determination of housing capacity and accommodation of needed housing by cities with population of 25,000 or greater
197A.278
Lane County accommodation of needed housing
197A.280
Determination of housing capacity and accommodation of needed housing by cities with population of less than 25,000
197A.285
Priority of land to be included within urban growth boundaries
197A.300
Definition of “serviceable.”
197A.302
Purposes
197A.305
Alternative amendment process
197A.310
Cities with population of less than 10,000
197A.312
Cities with population of 10,000 or greater
197A.315
Expansion study areas
197A.325
Review of final decision of city
197A.335
Determination of housing capacity and accommodation of needed housing by Metro cities
197A.348
Definition of “needed housing.”
197A.350
Determination of housing capacity and accommodation of needed housing by Metro
197A.355
Priority of land to be included within Metro urban growth boundary
197A.358
Metro urban growth boundary designation
197A.362
Timing of Metro accommodation of needed housing
197A.365
Metro housing coordination strategy
197A.370
Metro report of performance measures
197A.372
Metro evaluation of accommodation of needed housing
197A.395
Limits on local government prohibitions
197A.400
Clear and objective approval criteria required
197A.420
Duplexes
197A.425
Accessory dwelling units
197A.430
Single room occupancies
197A.445
Affordable housing allowed outright
197A.460
Residential use of commercial lands for affordable housing
197A.465
Local requirements to develop affordable housing
197A.470
Final action on affordable housing application
197A.500
Definitions for ORS 197A.500 to 197A.521
197A.502
Legislative findings
197A.503
Preemptive effect of ORS 197A.500 to 197A.521
197A.505
Establishment of criteria for decisions in land use final order
197A.507
Procedure for review of established criteria
197A.509
Development of land use final order
197A.511
Land use final order
197A.513
Plan amendments
197A.515
Land Use Board of Appeals review of land use final order
197A.517
Supreme Court review of Land Use Board of Appeals opinion on land use final order
197A.519
Amendments to land use final order
197A.521
Failure to meet timeline

Current through early 2026

§ 197A.500. Definitions for ORS 197A.500 to 197A.521's source at oregon​.gov