ORS 279C.830
Provisions concerning prevailing rate of wage in specifications, contracts and subcontracts
- applicability of prevailing wage
- bond
(1)
Intentionally left blank —Ed.(a)
Except as provided in paragraph (e) of this subsection, the specifications for every contract for public works must state the existing state prevailing rate of wage and, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act (40 U.S.C. 3141 et seq.) that must be paid to workers in each trade or occupation that the contractor or subcontractor or other person who is a party to the contract uses in performing all or part of the contract. If the prevailing rates of wage are available electronically or are accessible on the Internet, the specifications may incorporate the rates by referring to the electronically accessible or Internet-accessible rates and by providing adequate information about how to access the rates.(b)
If a public agency under paragraph (a) of this subsection must state the state and federal prevailing rates of wage in the specifications, the public agency shall also require the contractor to pay the higher of the applicable state or federal prevailing rate of wage to all workers on the public works.(c)
Every contract and subcontract must provide that the workers must be paid not less than the specified minimum hourly rate of wage in accordance with ORS 279C.838 (Applicability of state and federal rates of wage) and 279C.840 (Payment of prevailing rate of wage).(d)
If a public works project is subject both to ORS 279C.800 (Definitions for ORS 279C.800 to 279C.870) to 279C.870 (Civil action to enforce payment of prevailing rates of wage) and to the Davis-Bacon Act, every contract and subcontract must provide that workers on the public works must be paid not less than the higher of the applicable state or federal prevailing rate of wage.(e)
A public works project described in ORS 279C.800 (Definitions for ORS 279C.800 to 279C.870) (6)(a)(B) or (C) is subject to the existing state prevailing rate of wage or, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act that is in effect at the time a public agency enters into an agreement with a private entity for the project. After that time, the specifications for a contract for the public works must state the applicable prevailing rate of wage.(2)
Intentionally left blank —Ed.(a)
The specifications for a contract for public works must provide that the contractor and every subcontractor must have a public works bond filed with the Construction Contractors Board before starting work on the project, unless the contractor or subcontractor is exempt under ORS 279C.836 (Public works bond) (4), (7), (8) or (9).(b)
Every contract that a contracting agency awards must require the contractor to:(A)
Have a public works bond filed with the Construction Contractors Board before starting work on the project, unless the contractor is exempt under ORS 279C.836 (Public works bond) (4), (7), (8) or (9).(B)
Require, in every subcontract, that the subcontractor have a public works bond filed with the Construction Contractors Board before starting work on the project, unless the subcontractor is exempt under ORS 279C.836 (Public works bond) (4), (7), (8) or (9).(c)
Every subcontract that a contractor or subcontractor awards in connection with a public works contract between a contractor and a public agency must require any subcontractor to have a public works bond filed with the Construction Contractors Board before starting work on the public works project, unless the subcontractor is exempt under ORS 279C.836 (Public works bond) (4), (7), (8) or (9). [2003 c.794 §168; 2005 c.360 §10; 2007 c.415 §2; 2007 c.764 §37; 2007 c.844 §4; 2009 c.161 §2; 2011 c.265 §2; 2017 c.334 §2]