OAR 690-215-0080
Flowmeters and Dedicated Measuring Tubes


The Director may require the landowner to install totalizing flowmeters or dedicated measuring tubes on any water supply well, either as a condition of a water right permit or at a later date as circumstances may warrant. The landowner may be required to install totalizing flowmeters or dedicated measuring tubes on existing permitted wells and on wells which are exempted by ORS 537.545 (Exempt uses).

Source: Rule 690-215-0080 — Flowmeters and Dedicated Measuring Tubes, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=690-215-0080.