Substitution of Supplemental Ground Water Right for Primary Surface Water Right
(1)
As provided in ORS 540.524 (Substitution of supplemental water right from ground water source for primary water right from surface water source), the holder of both a primary surface water right certificate and a supplemental ground water right certificate or permit may substitute the use of the supplemental water right for the primary water right. This rule does not authorize a change in place of use, character of use, point of diversion or point of appropriation.(2)
A substitution may not be made under section (1) of this rule if the use of the supplemental ground water right results in an enlargement of the primary surface water right.(3)
An application shall be submitted on a form provided by the Department with the appropriate fee as established under ORS 536.050 (Fees). The Department may request additional information if necessary to assist with the injury evaluation.(4)
Upon receiving an application, the Department shall provide notice, accept protests and conduct hearings on protests in the manner described in ORS 540.520 (Application for change of use, place of use or point of diversion)(5) to (7) and OAR 690-380-4000 (Request for Comments) to 690-380-4200 (Hearings).(5)
The Director shall issue an order approving or denying the substitution. If the proposed substitution will result in injury, the Director shall prohibit or condition the use to avoid or mitigate the injury. The Director shall issue an order approving or denying the substitution within 90 days after the Department receives an application under section (1) of this rule.(6)
For the purpose of this rule, a substituted primary surface water right shall be treated as a supplemental water right and a substituted supplemental ground water right shall be treated as a primary water right.(7)
A completed and approved substitution of a supplemental ground water right for a primary surface water right under this rule may be terminated upon a request by the water right holder or by an order of the Director if the Director determines that the use of the ground water as the primary water right causes injury. Upon termination, the substituted primary and supplemental water rights shall revert back to their original status.
Source:
Rule 690-380-2330 — Substitution of Supplemental Ground Water Right for Primary Surface Water Right, https://secure.sos.state.or.us/oard/view.action?ruleNumber=690-380-2330
.