OAR 690-502-0260
Special Permit Conditions
(1)
A static water level measurement be made and submitted before any use of water may commence at the well;(2)
Limits on acceptable amounts of depletion and interference with other users;(3)
Use of water from the well be controlled or shut off if limits specified in the permit to protect the resource from depletion, and prior appropriators from interference, are exceeded;(4)
The Department shall determine, from measurements submitted by the permittee/appropriator, or other data on file in the department, the initial and subsequent water levels from which the previously cited declines are referenced;(5)
Following the issuance of a permit, the permittee/appropriator shall measure the water levels in the permitted well each year between March 1 and March 31 (spring high-water level) and submit the data to the Department within 90 days of measurement. Water level measurements shall be made by a certified water rights examiner, licensed water well driller, licensed pump installer, registered geologist, licensed land surveyor, registered professional engineer or the permittee/appropriator;(6)
Any other conditions as specified in OAR 690, division 008 as deemed necessary to protect the groundwater resource.