OAR 141-010-0250
Notice


(1)

At least 15 days before commencing a survey, the permittee shall provide notice as follows:

(a)

For all surveys, written notice of the specific survey site, including tract lines (if applicable), method of operation, vessel name, and contact person on board the vessel to the Department, Department of Fish and Wildlife, Department of Geology and Mineral Industries, and any other state agencies specified in the permit. The director shall take action on the notice as provided in OAR 141-010-0260 (Permit Conditions)(2)(k).

(b)

For surveys involving towed cables or equipment, public notice by publication in a newspaper of general circulation in the survey region, and posted notice at various waterfront locations within the survey region, such as bait shops, fuel docks and the harbormaster’s office.

(2)

The posted and public notice shall include, but not be limited to, the following information:

(a)

The general area of the survey, including the survey boundaries, the date(s) on which activities will occur, and the hours of operation;

(b)

The methods of survey, including length, width and depth of cable and equipment in tow, if applicable;

(c)

The name, registration number, radio call number, monitoring channel, and name of the captain of the survey vessel;

(d)

The name and address of the permittee and the name and phone number of a local contact person;

(e)

A statement that additional information may be obtained from the permittee or the Department.
Last Updated

Jun. 8, 2021

Rule 141-010-0250’s source at or​.us