OAR 333-061-0062
Land Use Coordination


(1)

The purpose of this rule is to assure that Oregon Health Authority’s actions taken pursuant to ORS 448.131 (Water quality, construction and installation standards) and OAR chapter 333, division 61, comply with state land use coordination requirements in ORS 197.180 (State agency planning responsibilities) and OAR chapter 660, divisions 30 and 31. This rule also implements applicable portions of the Authority’s state agency coordination program concerning the review and approval of plans and projects pursuant to ORS 448.131 (Water quality, construction and installation standards).

(2)

The requirements of OAR 333-061, shall apply to Authority approval of plans or projects submitted under ORS 448.131 (Water quality, construction and installation standards) for:

(a)

New public water systems;

(b)

Major additions, alterations, and extensions of water transmission mains;

(c)

Development of new water sources; and

(d)

Relocation of water treatment or storage facilities.

(3)

In order to approve a plan or project listed under subsections (2)(a) through (d) of this rule, the Authority shall find that it complies with the Statewide Planning Goals and is compatible with applicable acknowledged city and county comprehensive plan and land use regulations. To make its goal compliance and plan compatibility findings, the Authority shall comply with sections (1) through (9) of this rule and shall also adhere to the procedures in the Authority’s state agency coordination program which is hereby adopted by reference.

(4)

Except where the Authority is required to directly address the Statewide Planning Goals, the Authority shall make its goal compliance findings for each plan or project listed in subsections (2)(a) through (d) of this rule based on the land use compatibility information provided to the Authority by the project applicant.

(5)

An applicant seeking approval of a plan or project listed in subsections (2)(a) through (d) of this rule shall provide the Authority with information documenting the plan or project’s compatibility with the applicable acknowledged comprehensive plans and land use regulations. Such documentation shall be submitted in a manner as established by the Authority and shall include one of the following:

(a)

A copy of the local land use permit (for example, conditional use permit, subdivision approval, zoning clearance) demonstrating that the plan or project has received land use approval from the jurisdiction; or

(b)

Written information from an authorized representative of the affected city or county affirming that the proposed plan or project is compatible with the acknowledged comprehensive plan(s) for the area, but does not require specific land use approval by the jurisdiction; or

(c)

Other written information acceptable to the Authority equivalent to subsection (5)(a) or (b) of this rule demonstrating the plan or project’s land use compatibility.

(6)

The Authority shall adopt findings directly against the Statewide Planning Goals if a situation ever arises where the Authority must approve a plan or project, but is unable to rely upon or is not provided with the appropriate land use compatibility information by the applicant. In this instance, the Authority shall comply with OAR 660-030-0065 (Agency Compliance with the Statewide Planning Goals) and the corresponding procedures in the Authority’s state agency coordination program to adopt the necessary findings demonstrating the plan or project’s compliance with the Statewide Goals.

(7)

Where more than one unit of local government has land use approval authority over the plan or site of the proposed project, written information from the applicant must be submitted to the Authority as provided in section (5) of this rule documenting the plan or project’s compatibility with each of the affected jurisdiction’s comprehensive plans.

(8)

Information documenting land use compatibility in accordance with section (5) of this rule may be submitted to the Authority for public water system master plans or portions thereof. In this section, no subsequent land use compatibility determination will be required for an individual project where the applicant demonstrated that the project is contemplated by and consistent with the previously approved master plan.

(9)

The meaning of land use terms used in this rule shall be as defined in OAR 660-030-0005 (Definitions).

Source: Rule 333-061-0062 — Land Use Coordination, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=333-061-0062.

333–061–0005
Purpose
333–061–0010
Scope
333–061–0015
Adoption by Reference
333–061–0020
Definitions
333–061–0025
Responsibilities of Water Suppliers
333–061–0030
Maximum Contaminant Levels and Action Levels
333–061–0031
Maximum Residual Disinfectant Levels
333–061–0032
Treatment Requirements and Performance Standards for Surface Water, Groundwater Under Direct Influence of Surface Water, and Groundwater
333–061–0034
Treatment Requirements and Performance Standards for Corrosion Control
333–061–0036
Sampling and Analytical Requirements
333–061–0040
Reporting and Record Keeping
333–061–0042
Public Notice
333–061–0043
Consumer Confidence Reports
333–061–0045
Variances
333–061–0046
Permits
333–061–0050
Construction Standards
333–061–0055
Waivers from Construction Standards
333–061–0057
Voluntary Drinking Water Protection Program
333–061–0060
Plan Submission and Review Requirements
333–061–0061
Capacity Requirements for Public Water Systems
333–061–0062
Land Use Coordination
333–061–0063
Environmental Review Process for The Safe Drinking Water Revolving Loan Fund Program
333–061–0064
Emergency Response Plan Requirements
333–061–0065
Operation and Maintenance
333–061–0070
Cross Connection Control Requirements
333–061–0071
Backflow Prevention Assembly Installation and Operation Standards
333–061–0072
Backflow Assembly Tester Certification
333–061–0073
Cross Connection Specialist Certification
333–061–0074
Cross Connection Training Programs, Course, and Instructor Requirements
333–061–0075
Sanitary Surveys of Watersheds
333–061–0076
Sanitary Surveys
333–061–0077
Composite Correction Program & Comprehensive Performance Evaluations
333–061–0078
Coliform Investigations
333–061–0080
Role of Counties
333–061–0085
Supplemental Fluoridation
333–061–0087
Product Acceptability Criteria
333–061–0089
Annual Water System Fee
333–061–0090
Penalties
333–061–0095
Severability
333–061–0097
Adverse Health Effects Language
333–061–0098
References
333–061–0210
Operator Certification: Scope
333–061–0220
Classification of Water Treatment Plants and Water Distribution Systems
333–061–0225
General Requirements Applying to Water Suppliers and Water Systems
333–061–0228
Certification Requirements for Small Water System Operators
333–061–0230
Contracting For Services
333–061–0232
General Requirements Applying to Water System Operators
333–061–0235
Operator Certification Requirements, Levels 1–4
333–061–0245
Applications for Certification Levels 1–4
333–061–0250
Examinations for Certification, Levels 1–4
333–061–0260
Certificate Renewal Levels 1–4
333–061–0265
Fees
333–061–0270
Refusal, Suspension, or Revocation of Certification
333–061–0272
Suspension of Certification
333–061–0305
Domestic Well Program: Purpose
333–061–0310
Scope
333–061–0324
Area of Public Health Concern
333–061–0325
Domestic Well Tests
333–061–0330
Accredited Laboratories
333–061–0335
Sample Collection
333–061–0400
Reducing Lead in School Drinking Water
333–061–0510
Applicability of Cyanotoxin Rules
333–061–0520
Definitions
333–061–0530
Health Advisory Levels
333–061–0540
Cyanotoxin Monitoring
333–061–0550
Analytical Methods
333–061–0560
Reporting
333–061–0570
Public Notification
333–061–0580
Record Keeping
Last Updated

Jun. 8, 2021

Rule 333-061-0062’s source at or​.us