OAR 629-623-0700
Written Plans to Evaluate Public Safety Risk
(1)
To allow evaluation of public safety risk and the appropriate methods for reducing this risk, operators shall submit a written plan for all timber harvesting or road construction operations with intermediate or substantial downslope public safety risk as described in OAR 629-623-0300 (Public Safety Risk Levels). Written plans shall include:(a)
A determination of public safety risk (OAR 629-623-0300 (Public Safety Risk Levels));(b)
A map showing those portion(s) of the operation containing high landslide hazard locations;(c)
The location of all existing and proposed new roads crossing high landslide hazard locations;(d)
A detailed road design for all new or reconstructed roads crossing high landslide hazard locations;(e)
The location of habitable structures (Exposure Category A) and paved public roads (Exposure Category B) below the operation and within further review areas;(f)
Locations where timber harvesting will not occur;(g)
Locations where partial cutting will occur and the specific silvicultural prescription; and(h)
Additional information related to the operation as requested by the State Forester.(2)
Operators shall submit a written plan for proposed stream crossing fills constructed across debris torrent-prone streams with substantial or intermediate downslope public safety risk.(3)
Operators shall submit a written plan for proposed waste fill areas within a drainage containing debris torrent-prone streams where there is substantial or intermediate downslope public safety risk.