OAR 734-055-0040
Construction and Location Details
(1)
Applicant or its contractor shall advise the DM’s office at least 48 hours in advance of commencing construction of a facility for which a permit has been issued.(2)
Applicant shall submit with the permit application prints of adequate drawings or sketches showing in detail the location of the proposed facility or operation as described in the permit application with respect to existing and/or planned highway improvement, the roadway, the right-of-way lines, and, where applicable, the access control lines and approved access points:(a)
When attachment to a highway structure is involved, details of the attachment method including type of support, spacing, size of pipe and location of the facility shall be included. The attachment method shall be designed by a professional engineer;(b)
When the proposed facility involves pressure pipe lines the following additional data is required:(A)
Design pressure of pipe;(B)
Normal operating pressure;(C)
Maximum operating pressure.(3)
Applicant’s completed facility shall be in substantial conformance with the drawings or sketches referred to in section (2) of this rule unless special permission is obtained from the DM to vary from same during installation. When such permission is obtained, applicant shall furnish the DM two sets of “as constructed” drawings or sketches detailing any such variances.
Source:
Rule 734-055-0040 — Construction and Location Details, https://secure.sos.state.or.us/oard/view.action?ruleNumber=734-055-0040
.