ORS 527.750
Exceeding harvest type 3 size limitation

  • conditions
  • rules

(1)

Notwithstanding the requirements of ORS 527.740 (Harvest type 3 limitations), a harvest type 3 unit within a single ownership that exceeds 120 acres but does not exceed 240 acres may be approved by the State Forester if all the requirements of this section and any additional requirements established by the State Board of Forestry are met. Proposed harvest type 3 units that are within 300 feet of the perimeter of a prior harvest type 3 unit, and that would result in a total combined harvest type 3 area under a single ownership exceeding 120 acres but not exceeding 240 acres, may be approved by the State Forester if the additional requirements are met for the combined area. No harvest type 3 unit within a single ownership shall exceed 240 contiguous acres. No harvest type 3 unit shall be allowed within 300 feet of the perimeter of a prior harvest type 3 unit within a single ownership if the combined acreage of the areas subject to regulation under the Oregon Forest Practices Act would exceed 240 acres, unless:

(a)

The prior harvest type 3 unit has been reforested by all applicable regulations;

(b)

At least the minimum tree stocking required by rule is established per acre; and

(c)

Intentionally left blank —Ed.

(A)

The resultant stand of trees has attained an average height of at least four feet; or

(B)

At least 48 months have elapsed since the stand was created and it is “free to grow” as defined by the board.

(2)

The requirements of this section are in addition to all other requirements of the Oregon Forest Practices Act and the rules adopted thereunder. The requirements of this section shall be applied in lieu of such other requirements only to the extent the requirements of this section are more stringent. Nothing in this section shall apply to operations conducted under ORS 527.740 (Harvest type 3 limitations) (4) or (5).

(3)

The board shall require that a plan for an alternate practice be submitted prior to approval of a harvest type 3 operation under this section. The board may establish by rule any additional standards applying to operations under this section.

(4)

The State Forester shall approve the harvest type 3 operation if the proposed operation would provide better overall results in meeting the requirements and objectives of the Oregon Forest Practices Act.

(5)

The board shall specify by rule the information to be submitted for approval of harvest type 3 operations under this section, including evidence of past satisfactory compliance with the Oregon Forest Practices Act. [1991 c.919 §7; 1995 s.s. c.3 §39d; 1996 c.9 §6; 2003 c.740 §5; 2005 c.22 §378]

Source: Section 527.750 — Exceeding harvest type 3 size limitation; conditions; rules, https://www.­oregonlegislature.­gov/bills_laws/ors/ors527.­html.

527.260
Injuring forest tree of another or extracting pitch without, or in violation of, a permit prohibited
527.310
Definitions for ORS 527.310 to 527.370
527.315
Process components
527.321
Implementation of process by State Forester
527.335
Investigations by State Forester concerning pests
527.341
Forestland owners to implement strategies to carry out resource management objectives
527.346
State Forester to assist owners unable to take action against pest
527.360
Costs of eradication
527.370
Disposition of receipts
527.610
Short title
527.620
Definitions for ORS 527.610 to 527.770
527.630
Policy
527.640
Forest regions
527.650
Forest practice committees
527.660
Committees to review rules
527.665
Notice of reforestation requirements to be given in forestland transfers
527.670
Commencement of operations
527.672
Aerial herbicide applications
527.674
Rules requiring approval of written plan prohibited
527.676
Leaving snags and downed logs in harvest type 2 or 3 units
527.678
Wildlife food plots
527.680
Violation by operator
527.683
Notice of violation
527.685
Civil penalty considerations
527.687
Civil penalty procedure
527.690
Failure to comply with order to reforest or repair damage
527.700
Appeals from orders of State Forester
527.710
Duties and powers of board
527.714
Types of rules
527.715
Rules to establish standards and procedures
527.721
Coordination with state and local agencies for review and comment on operations
527.722
Restrictions on local government adoption of rules regulating forest operations
527.724
Forest operations to comply with air and water pollution control rules and standards
527.730
Conversion of forestland to other uses
527.736
Forest practice standards for operations on public and private land
527.740
Harvest type 3 limitations
527.745
Reforestation of certain harvest types
527.750
Exceeding harvest type 3 size limitation
527.755
Scenic highways
527.760
Reforestation exemptions for land use changes
527.765
Best management practices to maintain water quality
527.770
Good faith compliance with best management practices not violation of water quality standards
527.780
Exemption from liability for trees or debris left on property
527.785
Exemption from liability for large woody debris left on property
527.786
Definitions
527.787
Registering to receive notice of pesticide application
527.788
Notice to State Forestry Department of proposed pesticide application
527.789
Notice to nearby recipient of proposed pesticide application
527.790
Notice to State Forestry Department prior to pesticide application
527.791
Verifying completion of pesticide application
527.792
Designation of forestland units
527.793
Failure to send notice
527.794
Department reporting system
527.795
Daily spray records
527.796
Interference with pesticide application
527.797
Limitations on pesticide applications
527.798
Reporting points of diversion
527.990
Criminal penalties
527.992
Civil penalties
Green check means up to date. Up to date