OAR 340-150-0350
UST System Repairs


(1)

Repair methods. An owner and permittee must repair UST system components according to the manufacturer’s specifications and perform repairs in accordance with a code of practice developed by a nationally recognized association or an independent testing laboratory. The codes and standards listed in Appendix H of this division may be used to comply with this section. [Note: View a PDF of the appendix by clicking on the “Tables” link below.] A manufacturer’s authorized representative may make repairs to fiberglass or other nonmetallic USTs.

(2)

Lined tanks. An owner and permittee of a tank that has been previously repaired or upgraded using the interior lining method may repair the tank by restoring or adding additional lining to the tank if the metal portion of the tank has been determined to be structurally sound by use of the integrity assessment (inspection) method specified by American Petroleum Institute RP 1631, “Interior Lining and Periodic Inspection of Underground Storage Tanks.” An owner and permittee must permanently decommission a tank if the integrity assessment determines that the tank is no longer structurally sound.

(3)

Tanks. Before operating a repaired tank, an owner and permittee must:

(a)

Have the tank tightness tested after the repair is complete and report to DEQ any test failures (OAR 340-150-0445 (Tank Tightness Testing for Release Detection and Investigation)); and

(b)

For all repaired tanks except those repaired by lining, obtain written documentation that the original manufacturer has recertified the repaired UST as meeting current UST performance requirements. If the original manufacturer is not available (e.g., no longer in business, unknown, etc.) another manufacturer of the same tank brand or type must certify in writing that the tank meets the current UST performance requirements.

(4)

Piping. Before operating repaired underground piping, an owner and permittee must have the underground piping tightness tested after the repair is complete and report to DEQ any test failure (OAR 340-150-0410 (Release Detection Requirements and Methods for Underground Piping)).

(5)

Corrosion protection. An owner and permittee must have a cathodic protection system tested within six months following a repair to ensure proper operation and report to DEQ any test failure (OAR 340-150-0325 (Operation and Maintenance of Corrosion Protection)).

(6)

Record keeping. An owner and permittee must maintain records that demonstrate compliance with the requirements of this rule for the remaining operating life of the UST system. Records must include information such as a description of the work, date performed, name and address of the company that performed the work, equipment model number (as appropriate), test results and any other related data. An owner and permittee must make the records available for review by DEQ upon request.
[Note: Publications referenced are available from DEQ or from the publisher.]
[Note: View a PDF of appendices by clicking on the “Tables” link below.]
[ED. NOTE: To view attachments referenced in rule text, click here to view rule.]
340‑150‑0001
Purpose and Scope
340‑150‑0006
Applicability and General Requirements
340‑150‑0008
Exemptions and Deferrals
340‑150‑0010
Definitions
340‑150‑0020
UST General Permit Registration Certificate Required
340‑150‑0021
Termination of Temporary Permits
340‑150‑0052
Modification of Registration Certificates For Changes in Ownership and Permittee
340‑150‑0080
Denial, Suspension or Revocation of General Permit Registration Certificates
340‑150‑0102
Termination of General Permit Registration Certificates for Installation, Operation and Temporary Closure
340‑150‑0110
UST General Permit Registration, Annual Compliance and Other Fees
340‑150‑0135
General Requirements for Owners and Permittees
340‑150‑0137
UST Systems with Field-Constructed Tanks and Airport Hydrant Fuel Distribution Systems
340‑150‑0140
Requirements for Sellers of USTs
340‑150‑0150
Depositing Regulated Substances in USTs
340‑150‑0152
Requirements for Distributors of Regulated Substances for Deposit into USTs
340‑150‑0156
Performance of UST Services by Owners or Permittees
340‑150‑0160
General Permit Requirements for Installing an UST System
340‑150‑0163
General Permit Requirements for Operating an UST System
340‑150‑0167
General Permit Requirements for Temporary Closure of an UST System
340‑150‑0168
General Permit Requirements for Decommissioning an UST System by Permanent Closure or Change-in-Service
340‑150‑0180
Site Assessment Requirements
340‑150‑0200
Training Requirements for UST System Operators and Emergency Response Information
340‑150‑0210
Training Requirements for UST Operators
340‑150‑0250
Expedited Enforcement Process
340‑150‑0302
Installation of Used USTs
340‑150‑0310
Spill and Overfill Prevention Equipment and Testing Requirements
340‑150‑0315
Periodic operation and maintenance walkthrough inspections
340‑150‑0320
Corrosion Protection Performance Standards for USTs and Piping
340‑150‑0325
Operation and Maintenance of Corrosion Protection
340‑150‑0350
UST System Repairs
340‑150‑0352
UST System Modifications and Additions
340‑150‑0354
UST System Replacements
340‑150‑0360
Requirements for Internally Lined USTs
340‑150‑0400
General Release Detection Requirements for Petroleum UST Systems
340‑150‑0410
Release Detection Requirements and Methods for Underground Piping
340‑150‑0420
Release Detection Requirements for Hazardous Substance UST Systems
340‑150‑0430
Inventory Control Method of Release Detection
340‑150‑0435
Statistical Inventory Reconciliation Method of Release Detection
340‑150‑0440
Manual Tank Gauging Release Detection Method
340‑150‑0445
Tank Tightness Testing for Release Detection and Investigation
340‑150‑0450
Automatic Tank Gauging Release Detection Method
340‑150‑0465
Interstitial Monitoring Release Detection Method
340‑150‑0470
Other Methods of Release Detection
340‑150‑0500
Reporting Suspected Releases
340‑150‑0510
Suspected Release Investigation and Confirmation Steps
340‑150‑0520
Investigation Due to Off Site Impacts
340‑150‑0540
Applicability to Previously Closed UST Systems
340‑150‑0550
Definitions for OAR 340-150-0555 and 340-150-0560
340‑150‑0555
Compliance Dates for USTs and Piping
340‑150‑0560
Upgrading Requirements for Existing UST Systems
340‑150‑0600
Delegation of Program Administration
340‑150‑0620
Approval of More Stringent Performance Standards
Last Updated

Jun. 8, 2021

Rule 340-150-0350’s source at or​.us