OAR 340-272-0405
Notice of Verification Services
(1)
Before a verification body commences any verification services for the responsible entity, the responsible entity must ensure the verification body submits a notice of verification services to DEQ that meets the requirements of this rule. The notice of verification services must be submitted after DEQ has provided a determination that the potential for a conflict of interest is acceptable as specified under OAR 340-272-0500 (Requirements for Conflict of Interest Evaluation)(7) and that verification services may proceed.(a)
If the conflict of interest evaluation submitted by the responsible entity and the notice of verification services submitted by the verification body are submitted at the same time, verification services may not begin until DEQ has determined the potential for conflict of interest is acceptable in writing.(b)
Except as provided in subsection (a), the verification body may begin verification services for the responsible entity after the notice of verification services is received by DEQ, but must allow a minimum of 14 calendar days advance notice of a site visit unless an earlier date is approved by DEQ.(2)
The verification notice must include the following information:(a)
A list of the staff designated to provide verification services as a verification team, including the names of each individual, the lead verifier, and all subcontractors, and a description of the roles and responsibilities each member will have during verification. The independent reviewer must also be listed separately;(b)
Documentation that the verification team has the skills required to provide verification services for the responsible entity and type of report or fuel pathway application requiring verification. When required by DEQ, the notice must include a demonstration that the verification team includes at least one individual approved by DEQ as a sector specific verifier that is not also the independent reviewer, but may be the lead verifier; and(c)
General information about the responsible entity, including the following, as applicable:(A)
Name and list of facilities and other locations that will be subject to verification, and contact, address, telephone number, and e-mail address for each facility;(B)
The industry sector, North American Industry Classification System (NAICS) code, or source identification number for reporting facilities under OAR chapter 340, division 215.;(C)
The CFP ID(s) for the responsible entity under OAR chapter 340, division 253.;(D)
The date(s) of the site visit if full verification is being provided and if required under OAR 340-272-0420 (Site Visits), with physical address and contact information.; and(E)
A brief description of expected verification services to be provided, including expected completion date and whether quarterly review is planned in the context of an annual verification requirement.(3)
The responsible entity must ensure the verification body submits an updated notice of verification services to DEQ immediately if any of the information under section (2) changes after the notice of verification services is submitted to DEQ. When an updated notice of verification services is submitted to DEQ, the conflict of interest must be reevaluated and information must be resubmitted according to OAR 240-272-0500. Verification services must be suspended until DEQ approves the resubmitted conflict of interest evaluation information in writing.
Source:
Rule 340-272-0405 — Notice of Verification Services, https://secure.sos.state.or.us/oard/view.action?ruleNumber=340-272-0405
.