OAR 629-625-0440
Stabilization


(1)

Operators shall stabilize exposed material which is potentially unstable or erodible by use of seeding, mulching, riprapping, leaving light slashing, pull-back, or other effective means.

(2)

During wet periods operators shall construct roads in a manner which prevents sediment from entering waters of the state.

(3)

Operators shall not incorporate slash, logs, or other large quantities of organic material into road fills.

Source: Rule 629-625-0440 — Stabilization, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=629-625-0440 (accessed May 26, 2025).