OAR 690-020-0250
Maintenance of Dams


(1)

The Dam owner shall review and evaluate conditions of the Dam as necessary to keep the Dam in good repair and properly maintained, and address any detected conditions that may pose a risk of Dam Failure.

(2)

Proper maintenance includes, but is not limited to:

(a)

Removing brush and trees from the Dam;

(b)

Control of burrowing animals, especially nutria near the Dam or reservoir, including filling deep burrows;

(c)

Restoration of areas of surface or wave erosion, and taking measures to prevent future erosion;

(d)

Adding or moving fill to restore Crest Height and width;

(e)

Clearance of soil, rock, vegetation and debris from the Spillway;

(f)

Proper cycling and lubrication of Valves and Gates at least once a year, unless otherwise specified in a maintenance and operations plan approved by the Department;

(g)

Patching, sealing, or replacing areas of cracked concrete on the Dam;

(h)

Removing debris, rock, or earth from the inlet and outlet of penetrating Conduits and drains;

(i)

Repair or replacement of worn or damaged parts of Gates or Valves;

(j)

Ensuring access to the Dam is sufficient for inspection, repair and emergency actions, and that unauthorized access is controlled;

(k)

Securing operating equipment such as Valve controls and Spillway controls;

(l)

Evaluation of the Conduit and taking necessary actions to ensure the Conduit is not compromised, including patching pipes with minor corrosion; and

(m)

Addressing other conditions that might affect the safety of the Dam, including Maintenance Actions identified by the Department in an inspection document.

(3)

Records necessary to track the conditions of the Dam should be maintained.

Source: Rule 690-020-0250 — Maintenance of Dams, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=690-020-0250.

690‑020‑0000
Purpose and Applicability
690‑020‑0022
Definitions
690‑020‑0024
General Department Authorities and Intergovernmental Coordination
690‑020‑0026
Fees
690‑020‑0028
Preliminary Plans and Specifications for Construction of New Dams or to Increase Dam Height
690‑020‑0035
Minimum Engineering Requirements for Final Design of New Dams or to Increase Dam Height
690‑020‑0036
Design Requirements for New Dams or to Increase Dam Height: Site Suitability and Geotechnical Evaluation
690‑020‑0037
Design Requirements for New Dams or to Increase Dam Height: Hydrology and Inflow Design Flood
690‑020‑0038
Design Requirements for New Dams or to Increase Dam Height: Embankment Dam Structures
690‑020‑0041
Design Requirements for New Dams or to Increase Dam Height: Concrete Dam Structures
690‑020‑0042
Minimum Design Requirements for New Dams or to Increase Dam Height: Spillways
690‑020‑0043
Design Requirements for New Dams or to Increase Dam Height: Penetrating Conduit(s) and Control of Flow through Conduits
690‑020‑0044
Design Requirements for New Dams or to Increase Dam Height: Instrumentation for Monitoring
690‑020‑0047
Design Requirements for New Dams or to Increase Dam Height: Geosynthetics
690‑020‑0048
Exceptions to Standard Design Requirements
690‑020‑0055
Design Requirements for New Dams or to Increase Dam Height: Design Drawings
690‑020‑0060
Design Requirements for New Dams or to Increase Dam Height: Construction Specifications
690‑020‑0065
Plan Requirements for New Dams or to Increase Dam Height: Construction Administration
690‑020‑0068
Plan Requirements for New Dams or to Increase Dam Height: Operations and Maintenance Plan
690‑020‑0070
New Dams or to Increase Dam Height: Submittals and Notifications by the Engineer of Record
690‑020‑0080
New Dams, or to Increase Dam Height, Written Approval by State Engineer
690‑020‑0100
Hazard Rating of Dams
690‑020‑0120
Dam Breach Inundation Analysis
690‑020‑0140
Modification of Dams
690‑020‑0160
Removal
690‑020‑0180
Requirement of Owners to Provide Contact and Transfer of Title Information
690‑020‑0250
Maintenance of Dams
690‑020‑0260
Inspection of Dams
690‑020‑0310
Requirement to Address Maintenance Actions Need for High or Significant Hazard Dams
690‑020‑0340
Potentially Unsafe or Unsafe Conditions
690‑020‑0400
Emergency Action Plans (EAP)
690‑020‑0420
Immediate Action to Prevent Dam Failure
690‑020‑0460
Proposed Final Order, Request for Hearing, Contested Case Process
690‑020‑0600
Civil Penalty Assessment for Dam Safety
Last Updated

Jun. 8, 2021

Rule 690-020-0250’s source at or​.us