OAR 690-205-0020
Water Supply Well Constructor’s License, Experience Requirements and Trainee Card


(1)

License. To qualify for a Water Supply Well Constructor’s License, a person shall:

(a)

Be at least 18 years old;

(b)

Pass a written examination;

(c)

Have a minimum of one year experience, during the previous 36 month period, in water supply well construction, conversion, alteration, or abandonment. This experience shall include the operation of well drilling machinery for water supply well construction, alteration, conversion, or abandonment on a minimum of fifteen water supply wells or a demonstration of equivalent experience in the operation of well drilling machinery. The following are acceptable as evidence of experience:

(A)

Water supply well reports, or rough well logs with applicants’ name entered, for each of the 15 wells. The name, address, and telephone number of the person responsible for the construction of each well shall be included on each report or log.

(B)

Income tax returns showing source of drilling income for a period of time, or worker’s compensation account information or the equivalent may be established to satisfy the one year of active construction requirement.

(C)

Any other evidence the Director may deem suitable.

(D)

A license held in another state shall not substitute for required evidence of experience.

(d)

Pay a license fee.

(2)

Trainee. If an applicant passes the written Water Supply Well Constructor’s License examination, but cannot meet the experience requirement, the Commission may issue a trainee card. To qualify for a Water Supply Well Constructor Trainee Card, a person must:

(a)

Be at least 18 years old;

(b)

Pass a written examination; and

(c)

Be supervised by a person who holds a valid Water Supply Well Constructor’s License.

(3)

Trainee card. A trainee card is valid for three (3) years from the date the examination was passed.

(4)

Supervision. Supervision as it relates to any person who holds a Water Supply Well Constructor Trainee Card:

(a)

A trainee may operate a cable tool drilling machine without a licensed Water Supply Well Constructor physically present at the well site only if:

(A)

The licensed constructor can reach the well site within two hours if so requested by an authorized representative of the Department; and

(B)

The licensed constructor has signed the rough drilling log within eight working hours prior to the representative’s visit.

(b)

A licensed Water Supply Well Constructor must physically be on the site at all times when a cable tool drilling machine is:

(A)

Drilling within a flowing artesian well;

(B)

Setting or advancing casing;

(C)

Setting liner;

(D)

Perforating casing;

(E)

Setting well screens;

(F)

Placing packers;

(G)

Placing casing seals;

(c)

A Water Supply Well Constructor trainee may operate a non-cable tool water supply well drilling machine without a licensed Water Supply Well Constructor physically present at the well site only during the following events:

(A)

Air test or pump test of the well;

(B)

Gravel packing operations;

(C)

Developing a completed well;

(D)

Removal of the drill stem from the well.

(d)

Activities under subsection (4)(c)(A)–(D) of this rule shall proceed only if:

(A)

The licensed Water Supply Well Constructor can reach the site within one hour if so requested by an authorized representative of the Department; and

(B)

The licensed Water Supply Well Constructor has signed the rough drilling log within eight working hours prior to the representative’s visit.

(e)

An authorized representative of the Department in whose jurisdiction the water supply well is being constructed has the authority to:

(A)

Grant an extension to the time limits stated above when a request, showing good cause, is received from the bonded constructor in advance for each particular well; and

(B)

Place additional restrictions on the trainee, including requiring the constructor to be on the site at all times while the drilling machine is operating, when the authorized Department representative determines that either the drilling environment or the knowledge and/or experience of the trainee warrant closer supervision.

(f)

For a Water Supply Well Constructor Trainee to operate a water supply well drilling machine without a licensed Water Supply Well Constructor present, the trainee’s card must be endorsed with the name of the bonded Water Supply Well Constructor responsible for the construction of the water supply well.

(5)

Other supervision requirements for persons not licensed or permitted to construct water supply wells, or who do not hold a Water Supply Well Constructor Trainee Card:

(a)

Persons who are in the act of constructing, altering, converting or abandoning water supply wells must be supervised by a licensed Water Supply Well Constructor who is physically present at the well site at all times during construction, alteration, conversion, or abandonment activity.

(b)

The supervising Water Supply Well Constructor is responsible for all applicable statutes and rules in construction, alteration, conversion, or abandonment of the water supply well.

(6)

Persons who satisfy all requirements of ORS 537.747 (Water well constructor’s license)(3) shall be issued a Water Supply Well Constructor’s License. The responsibilities for issuing and securing a Water Supply Well Constructor’s License or trainee card are listed in subsections (a) and (b) of this section.

(a)

The Water Supply Well Constructor’s License applicant is responsible for:

(A)

Completing an application or renewal form for a new or renewed license or trainee card;

(B)

Submitting the application or renewal form to the Water Resources Department along with the required fees;

(C)

Carrying the license or trainee card whenever constructing, altering, converting, or abandoning any water supply well; and

(D)

Providing the Water Resources Department, within 30 days, notification of any change of mailing address.

(E)

Providing the Water Resources Department documentation satisfying the continuing education requirements set forth in OAR 690-205-0035 (Continuing Education Committee) through 690-205-0120 (Waivers).

(b)

The Water Resources Department is responsible for:

(A)

Designing and providing Water Supply Well Constructor license(s) and trainee cards;

(B)

Designing and providing application forms and renewal forms for licenses and application forms for trainee cards;

(C)

Processing applications and renewals for licenses and applications for trainee cards;

(D)

Returning incomplete application and renewal forms to applicants for completion; and

(E)

Sending new and renewed licenses to applicants who have completed the application or renewal form and submitted the required fee. This does not preclude refusal to renew as outlined in OAR 690-205-0025 (Term of Water Well Constructor License and License Fees)(4).

(7)

Bonded Water Supply Well Constructor. For a person to possess a bonded Water Supply Well Constructor’s License, the person must provide to the Department a properly executed Water Well Constructor’s Bond or Irrevocable Letter of Credit. The Water Resources Department shall indicate on the constructor’s license a bonded classification.

(8)

Representatives of the Water Resources Department may ask anyone constructing, altering, or abandoning a water supply well to present their license or trainee card as proof of eligibility to construct, alter, convert, or abandon water supply wells in the State of Oregon. Licensed individuals shall display their license or trainee card and photo identification when they are requested to do so by Water Resources Department personnel.

Source: Rule 690-205-0020 — Water Supply Well Constructor’s License, Experience Requirements and Trainee Card, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=690-205-0020.

Last Updated

Jun. 24, 2021

Rule 690-205-0020’s source at or​.us