Oregon Department of Consumer and Business Services, Building Codes Division

Rule Rule 918-308-0300
Review of Municipality Program


(1)

The division shall conduct a comprehensive review of each municipality delegated administration of the electrical program at least every five years.

(2)

A comprehensive review shall be conducted by a minimum team of:

(a)

One local building official;

(b)

One electrical contractor or contractor’s representative;

(c)

Division chief electrical inspector or Oregon Electrical Specialty Code inspector if the chief inspector is unable to serve; and

(d)

One division representative;

(e)

Optionally, a general contractor registered with the Construction Contractors Board, if nominated by the municipality involved;

(f)

Optionally, additional persons, depending on the size and complexity of the municipality involved, as determined and selected by the division.

(3)

A single-purpose review shall be conducted by the division chief electrical inspector or designee and others selected by the division if the operations of the municipality are at variance with its approved operating plan.
[Publications: Publications referenced are available from the agency.]
Source

Last accessed
Jun. 8, 2021