ORS 480.595
Permits
- rules
- fees
(1)
The Department of Consumer and Business Services may adopt rules regarding installation permits and operating permits. The rules may include, but need not be limited to, rules creating standardized forms, establishing operating permit fees, establishing permit cycles and setting terms and conditions for permit validity.(2)
Upon timely receipt of an installation permit fee, the department may issue an installation permit, perform an installation inspection and issue a temporary operating authorization.(3)
Upon timely receipt of an operating permit fee, the department may issue or renew an operating permit and may perform a periodic inspection if required during the operating permit cycle.(4)
Except as provided in ORS 480.525 (Exempt vessels) and 480.600 (Special provisions on permit and inspection fees), installation permit fees are as follows:(a)
For boilers, $175.(b)
For pressure vessels, $125.(5)
Except as provided in ORS 480.600 (Special provisions on permit and inspection fees), maximum operating permit fees per year are as follows:(a)
Power boilers of 15 horsepower(b)
Other boilers of 15 horsepower(c)
Power boilers greater than 15(d)
Other boilers greater than 15(e)
Power boilers greater than 100(f)
Other boilers greater than 100(g)
Power boilers greater(h)
Other boilers greater(i)
Notwithstanding paragraphs(a)
to (h) of this subsection,(j)
Pressure vessels having(k)
Pressure vessels having(6)
For a reinspection, the fee is $75.(7)
For the submission of plans and other pertinent data when required, for each boiler or pressure vessel, the fee is $78. [1961 c.485 §19; 1967 c.447 §3; 1969 c.582 §16; 1973 c.830 §6; 1973 c.832 §18a; 1974 c.36 §17; 1981 c.566 §2; 1983 c.676 §16; 1991 c.201 §3; 2001 c.162 §1; 2007 c.487 §9; 2009 c.696 §17]
Source:
Section 480.595 — Permits; rules; fees, https://www.oregonlegislature.gov/bills_laws/ors/ors480.html
.