ORS 537.797
Criteria for certification to determine work completion
- rules
(1)
As used in this section:(a)
“District” means:(A)
An irrigation district formed under ORS chapter 545;(B)
A drainage district formed under ORS chapter 547;(C)
A water improvement district formed under ORS chapter 552; or(D)
A water control district formed under ORS chapter 553.(b)
“Registered geologist” has the meaning given that term in ORS 672.505 (Definitions for ORS 672.505 to 672.705).(c)
“Registered professional engineer” and “registered professional land surveyor” have the meanings given those terms in ORS 672.002 (Definitions for ORS 672.002 to 672.325).(2)
The Water Resources Commission by rule shall establish criteria for certification under ORS 537.798 (Water right examiner certificate) to conduct surveys to determine whether a permittee has completed all work necessary to perfect an appropriation of water under ORS 537.230 (Time allowed for construction of irrigation or other work), 537.630 (Time allowed for construction work under permit) and 540.530 (Order authorizing change of use, place of use or point of diversion).(3)
An individual may apply for certification under ORS 537.798 (Water right examiner certificate) if the individual meets the criteria established by rule by the commission and is a:(a)
Registered professional engineer;(b)
Registered professional land surveyor;(c)
Registered geologist; or(d)
District employee who:(A)
Is, at the time of applying, employed full-time by a district;(B)
Has been employed by a district for seven or more years; and(C)
Has seven or more years of relevant technical experience conducting similar work. [1987 c.542 §1; 1989 c.171 §70; 1995 c.7 §1; 2009 c.259 §29; 2023 c.532 §1; 2023 c.606 §17]
Source: