OAR 141-089-0805
Wetland Ecosystem Restoration - Eligibility Requirements


(1)

Project Purpose. The project purpose is to improve the existing condition of a site to repair (rehabilitate) or return (re-establish) natural or historical functions to a disturbed or former wetland. The project may not be for the purpose of altering a site to produce conditions that did not previously exist in order to augment specific functions.

(2)

Compatible with Management Plans. The project must not be detrimental to existing functions and values that address problems identified in a watershed management plan or water quality management plan.

(3)

Evidence Required. Current site conditions must exhibit alterations in topography, soils, native vegetation or hydrology that have resulted in wetland loss or wetland disturbance that is potentially reversible.

(4)

Conversion. The project will not result in conversion of wetlands to uplands and will not include the conversion of existing, functional wetland ecosystems to another aquatic use.

(5)

Minimal Adverse Impacts. The project will not cause more than minimal adverse impacts to undisturbed wetland communities on-site or adjacent to the site.

(6)

Non-native Species The project will not involve the introduction of non-native plants other than for temporary soil stabilization. Native seed mixes are preferred. When native seed mix is not available, non-native seed mix that will hold the soil and not persist may be used if certified free of noxious weeds.

(7)

Hydrology. Hydrologic manipulation must result in the hydrology of the restored site approximating the conditions that existed before the disturbance or alteration, to the extent practicable. Hydrology conditions include timing of inflow and outflow, duration, frequency and hydroperiod.

(8)

Consistent with Wetland Conservation Plan. If the project is in an area for which there is a Department-approved Wetland Conservation Plan, the activities must be in conformance with that plan.

(9)

Compensatory Mitigation. Projects cannot be for the purpose of constructing compensatory wetland mitigation.

Source: Rule 141-089-0805 — Wetland Ecosystem Restoration - Eligibility Requirements, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=141-089-0805.

141‑089‑0620
General
141‑089‑0625
General Authorizations (GA)
141‑089‑0630
Project Applicability
141‑089‑0635
Fees
141‑089‑0640
Pre-Construction Notification
141‑089‑0645
Expiration of Project Eligibility
141‑089‑0650
General Conditions
141‑089‑0655
Enforcement
141‑089‑0656
Authorization Decision Appeals
141‑089‑0660
Minimal Disturbance Within ESH - Purpose
141‑089‑0665
Minimal Disturbance Within ESH - Eligibility Requirements
141‑089‑0670
Minimal Disturbance Within ESH - Authorized Activities
141‑089‑0675
Minimal Disturbance Within ESH - Activity-Specific Conditions
141‑089‑0680
Piling Placement And Removal Within ESH - Purpose
141‑089‑0685
Piling Placement And Removal Within ESH - Eligibility Requirements
141‑089‑0690
Piling Placement And Removal Within ESH - Authorized Activities
141‑089‑0695
Piling Placement And Removal Within ESH - Activity-Specific Conditions
141‑089‑0700
Temporary Impacts to Non-Tidal Wetlands - Purpose
141‑089‑0705
Temporary Impacts to Non-Tidal Wetlands - Eligibility Requirements
141‑089‑0710
Temporary Impacts to Non-Tidal Wetlands - Authorized Activities
141‑089‑0715
Temporary Impacts to Non-Tidal Wetlands - Activity-Specific Conditions
141‑089‑0720
Waterway Bank Stabilization - Purpose
141‑089‑0725
Waterway Bank Stabilization - Eligibility
141‑089‑0730
Waterway Bank stabilization - Authorized Activities
141‑089‑0735
Waterway Bank Stabilization - Activity-Specific Conditions
141‑089‑0740
Transportation-Related Activities - Purpose
141‑089‑0745
Transportation-Related Activities - Eligibility Requirements
141‑089‑0750
Transportation-Related Activities - Authorized Activities
141‑089‑0755
Transportation-Related Activities - Activity-Specific Conditions
141‑089‑0760
Removing Sediment Behind Tidegates - Purpose
141‑089‑0765
Removing Sediment Behind Tidegates - Eligibility Requirements-Ineligible Projects
141‑089‑0770
Removing Sediment Behind Tidegates - Mandatory Requirements
141‑089‑0775
Removing Sediment Behind Tidegates - Conditions of Issuance of General Authorization
141‑089‑0780
Waterway Habitat Restoration - Purpose
141‑089‑0785
Waterway Habitat Restoration - Eligibility Requirements
141‑089‑0790
Waterway Habitat Restoration - Authorized Activities
141‑089‑0795
Waterway Habitat Restoration - Activity-Specific Conditions
141‑089‑0800
Wetland Ecosystem Restoration - Purpose
141‑089‑0805
Wetland Ecosystem Restoration - Eligibility Requirements
141‑089‑0810
Wetland Ecosystem Restoration - Authorized Activities
141‑089‑0815
Wetland Ecosystem Restoration - Activity-Specific Conditions
141‑089‑0820
Non-motorized In-stream Placer Mining in ESH – Purpose
141‑089‑0823
Non-motorized In-stream Placer Mining within ESH - Definitions
141‑089‑0825
Non-motorized In-stream Placer Mining in ESH - Eligibility Requirements
141‑089‑0827
Non-motorized In-stream Placer Mining within ESH - Expiration and No Transfer
141‑089‑0830
Non-motorized In-stream Placer Mining in ESH - Authorized Activities
141‑089‑0835
Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions
Last Updated

Jun. 8, 2021

Rule 141-089-0805’s source at or​.us