OAR 141-089-0823
Non-motorized In-stream Placer Mining within ESH - Definitions


For the purposes of OAR 141-089-0820 (Non-motorized In-stream Placer Mining in ESH – Purpose) through 141-089-0835 (Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions), the following definitions are used in addition to those found in ORS 196.600 (Definitions for ORS 196.600 to 196.655) to 196.990 (Penalties) and OAR 141-085-0510 (Definitions).

(1)

“Completion of the activity” means the responsible party will not return or has not returned to the activity location to resume the activity within 24 hours.

(2)

“Gravity Dredge” means a device with a suction nozzle and hose for conveyance of streambed material for which suction is created by gravity. A gravity dredge does not have an auxiliary power source.

(3)

“Motorized Equipment” means equipment or devices powered by internal combustion, hydraulics, pneumatics, electricity, or mechanical means.

(4)

“In-stream” means below the ordinary high water line of a stream and within the wet perimeter and any adjacent non-vegetated dry gravel bar.

(5)

“Placer Mining” means to search or explore for samples of gold, silver or other precious metals by removing, filling or moving material from or within the bed of a stream.

(6)

“Siphon Dredge” means a device with a suction nozzle and hose for conveyance of streambed material for which suction is created by siphon action. A siphon dredge does not have an auxiliary power source.

Source: Rule 141-089-0823 — Non-motorized In-stream Placer Mining within ESH - Definitions, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=141-089-0823.

141‑089‑0620
General
141‑089‑0625
General Authorizations (GA)
141‑089‑0630
Project Applicability
141‑089‑0635
Fees
141‑089‑0640
Pre-Construction Notification
141‑089‑0645
Expiration of Project Eligibility
141‑089‑0650
General Conditions
141‑089‑0655
Enforcement
141‑089‑0656
Authorization Decision Appeals
141‑089‑0660
Minimal Disturbance Within ESH - Purpose
141‑089‑0665
Minimal Disturbance Within ESH - Eligibility Requirements
141‑089‑0670
Minimal Disturbance Within ESH - Authorized Activities
141‑089‑0675
Minimal Disturbance Within ESH - Activity-Specific Conditions
141‑089‑0680
Piling Placement And Removal Within ESH - Purpose
141‑089‑0685
Piling Placement And Removal Within ESH - Eligibility Requirements
141‑089‑0690
Piling Placement And Removal Within ESH - Authorized Activities
141‑089‑0695
Piling Placement And Removal Within ESH - Activity-Specific Conditions
141‑089‑0700
Temporary Impacts to Non-Tidal Wetlands - Purpose
141‑089‑0705
Temporary Impacts to Non-Tidal Wetlands - Eligibility Requirements
141‑089‑0710
Temporary Impacts to Non-Tidal Wetlands - Authorized Activities
141‑089‑0715
Temporary Impacts to Non-Tidal Wetlands - Activity-Specific Conditions
141‑089‑0720
Waterway Bank Stabilization - Purpose
141‑089‑0725
Waterway Bank Stabilization - Eligibility
141‑089‑0730
Waterway Bank stabilization - Authorized Activities
141‑089‑0735
Waterway Bank Stabilization - Activity-Specific Conditions
141‑089‑0740
Transportation-Related Activities - Purpose
141‑089‑0745
Transportation-Related Activities - Eligibility Requirements
141‑089‑0750
Transportation-Related Activities - Authorized Activities
141‑089‑0755
Transportation-Related Activities - Activity-Specific Conditions
141‑089‑0760
Removing Sediment Behind Tidegates - Purpose
141‑089‑0765
Removing Sediment Behind Tidegates - Eligibility Requirements-Ineligible Projects
141‑089‑0770
Removing Sediment Behind Tidegates - Mandatory Requirements
141‑089‑0775
Removing Sediment Behind Tidegates - Conditions of Issuance of General Authorization
141‑089‑0780
Waterway Habitat Restoration - Purpose
141‑089‑0785
Waterway Habitat Restoration - Eligibility Requirements
141‑089‑0790
Waterway Habitat Restoration - Authorized Activities
141‑089‑0795
Waterway Habitat Restoration - Activity-Specific Conditions
141‑089‑0800
Wetland Ecosystem Restoration - Purpose
141‑089‑0805
Wetland Ecosystem Restoration - Eligibility Requirements
141‑089‑0810
Wetland Ecosystem Restoration - Authorized Activities
141‑089‑0815
Wetland Ecosystem Restoration - Activity-Specific Conditions
141‑089‑0820
Non-motorized In-stream Placer Mining in ESH – Purpose
141‑089‑0823
Non-motorized In-stream Placer Mining within ESH - Definitions
141‑089‑0825
Non-motorized In-stream Placer Mining in ESH - Eligibility Requirements
141‑089‑0827
Non-motorized In-stream Placer Mining within ESH - Expiration and No Transfer
141‑089‑0830
Non-motorized In-stream Placer Mining in ESH - Authorized Activities
141‑089‑0835
Non-motorized In-stream Placer Mining in ESH - Activity-Specific Conditions
Last Updated

Jun. 8, 2021

Rule 141-089-0823’s source at or​.us