OAR 333-113-0150
Equipment Control: Use of a Sealed Source in a Well without a Surface Casing


The licensee may use a sealed source in a well without a surface casing for protecting fresh water aquifers only if the licensee follows a procedure for reducing the probability of the source becoming lodged in the well. The procedure must be approved by the Authority, the U.S. Nuclear Regulatory Commission, an Agreement State or a Licensing State.

Source: Rule 333-113-0150 — Equipment Control: Use of a Sealed Source in a Well without a Surface Casing, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=333-113-0150.

333–113–0001
Purpose and Scope
333–113–0005
Definitions
333–113–0007
Specific Licenses For Well Logging
333–113–0010
Agreement With Well Owner of Operator
333–113–0101
Equipment Control: Limits on Levels of Radiation
333–113–0105
Equipment Control: Storage Precautions
333–113–0110
Equipment Control: Transport Precautions
333–113–0115
Equipment Control: Radiation Survey Instruments
333–113–0120
Equipment Control: Leak Testing of Sealed Sources
333–113–0125
Equipment Control: Physical Inventory
333–113–0130
Equipment Control: Utilization Records
333–113–0135
Equipment Control: Design, Performance and Certification Criteria for Sealed Sources
333–113–0140
Equipment Control: Labeling
333–113–0145
Equipment Control: Inspection and Maintenance
333–113–0150
Equipment Control: Use of a Sealed Source in a Well without a Surface Casing
333–113–0201
Requirements for Personnel Safety: Training Requirements
333–113–0203
Requirements for Personnel Safety: Subjects to be Included in Training Courses for Logging Supervisors
333–113–0205
Requirements for Personnel Safety: Operating and Emergency Procedures
333–113–0210
Requirements for Personnel Safety: Personnel Monitoring
333–113–0301
Precautionary Procedures in Logging and Subsurface Tracer Studies: Security
333–113–0305
Precautionary Procedures in Logging and Subsurface Tracer Studies: Handling Tools
333–113–0310
Precautionary Procedures in Logging and Subsurface Tracer Studies: Subsurface Tracer Studies
333–113–0315
Precautionary Procedures in Logging and Subsurface Tracer Studies: Particle Accelerators
333–113–0325
Precautionary Procedures in Logging and Subsurface Tracer Studies: Energy Compensation Source
333–113–0335
Precautionary Procedures in Logging and Subsurface Tracer Studies: Tritium Neutron Generator Target Source
333–113–0401
Radiation Surveys
333–113–0403
Radiation Surveys and Records: Radioactive Contamination Control
333–113–0405
Radiation Surveys and Records: Documents and Records Required at Field Stations
333–113–0410
Radiation Surveys and Records: Documents and Records Required at Temporary Jobsites
333–113–0501
Notification of Incidents, Abandonment and Lost Sources
Last Updated

Jun. 8, 2021

Rule 333-113-0150’s source at or​.us