OAR 340-240-0520
Klamath Falls Nonattainment Area: Control of Fugitive Emissions
(1)
All sawmills, plywood mills and veneer manufacturing plants, particleboard and hardboard plants, asphalt plants, rock crushers, animal feed manufacturers, and other major industrial facilities as identified by the DEQ, must prepare and implement site-specific plans for the control of fugitive emissions. The plan must be submitted to the DEQ for approval in accordance with paragraph (5) below.(2)
Fugitive emission-control plans must identify reasonable measures to prevent particulate matter from becoming airborne, and avoid the migration of material onto the public road system. Such reasonable measures may include, but are not limited to the following:(a)
Paving all roads and areas on which vehicular traffic occurs at the facility;(b)
Scheduled application of water, or other suitable chemicals on unpaved roads, log storage or sorting yards, materials stockpiles, and other surfaces which can create airborne dust. Dust suppressant material must not adversely affect water quality;(c)
Periodic sweeping or cleaning of paved roads and other areas as necessary to prevent migration of material onto the public road system;(d)
Full or partial enclosure of materials stockpiled or other best management practices in cases where application of oil, water, or chemicals are not sufficient to prevent particulate matter from becoming airborne;(e)
Installation and use of hoods, fans, and fabric filters to enclose and vent the handling of dusty materials;(f)
Adequate containment during sandblasting or other similar operations;(g)
Covering, at all times when in motion, open bodied trucks transporting materials likely to become airborne; and(h)
Procedures for the prompt removal of earth or other material from paved streets.(3)
Reasonable measures may include landscaping and using vegetation to reduce the migration of material onto public and private roadways or from becoming airborne.(4)
The facility owner or operator must supervise and control fugitive emissions and material that may become airborne caused by the activity of outside contractors delivering or removing materials at the site.(5)
For existing sources, the site-specific fugitive emissions control plan must be submitted to the DEQ by July 1, 2013. For sources that obtain their initial permit after December 14, 2012, the site-specific fugitive emission control plan must be submitted within 60 days after permit issuance. For portable sources that move into the nonattainment area after December 14, 2012, the site-specific fugitive emission control plan must be submitted with the relocation notification. Unless otherwise notified by the DEQ, the fugitive emission control plan will be approved by default within 30 days after the plan is submitted to the DEQ. The DEQ may request revisions to the plan at any time if fugitive emissions are not adequately controlled as demonstrated by visible emissions.
Source:
Rule 340-240-0520 — Klamath Falls Nonattainment Area: Control of Fugitive Emissions, https://secure.sos.state.or.us/oard/view.action?ruleNumber=340-240-0520
.