OAR 734-051-5030
Construction of Approaches


(1)

Notice of Intent to Begin Construction. A permittee must notify the region manager at least two workdays prior to beginning construction.

(2)

Construction. Construction must conform to the terms of the construction permit including any special provisions, mitigation measures, conditions, or agreements, and the applicant must notify the region manager when construction is complete.

(3)

Utilities, Erosion Control, Signs, Work Area Safety. The applicant or permittee is responsible for complying with the following requirements of subsections (a) through (d) below:

(a)

The applicant shall relocate or adjust any utilities located on highway right of way when required for accommodation of the approach, and no construction may be performed until the permittee furnishes evidence to the department that satisfactory arrangements have been made with the owner of the affected utility facility;

(b)

The applicant shall provide erosion control during construction of the approach;

(c)

The applicant shall comply with applicable sign requirements. Where warning signs are required by the construction permit, other regulations, or the region manager, the department furnishes, places, and maintains the signs at the permittee’s expense; and unauthorized signs are not allowed on any portion of the right of way; and

(d)

The applicant shall comply with work area safety requirements. The work area during any construction or maintenance performed under a construction permit or a permit to operate shall be protected in accordance with the 2003 Manual on Uniform Traffic Control Devices (MUTCD), the Oregon Supplement to MUTCD, and Oregon Temporary Traffic Control Handbook adopted under OAR 734-020-0005 (Traffic Control Devices).

(4)

Inspection. Upon inspection of the approach the department shall notify the permittee if construction deficiencies exist, and:

(a)

The permittee must correct all deficiencies within sixty (60) days of notification that deficiencies exist and notify the region manager; and

(b)

The region manager shall re-inspect the approach.

(5)

Compliance. If a permittee fails to comply with the terms and conditions of the construction permit the department may, at the permittee’s expense:

(a)

Reconstruct or repair the approach; or

(b)

Cancel the construction permit and remove the approach.

Source: Rule 734-051-5030 — Construction of Approaches, https://secure.­sos.­state.­or.­us/oard/view.­action?ruleNumber=734-051-5030.

734–051–1010
Authority for Rules — General Provisions
734–051–1020
Purpose and Intent of Rules
734–051–1030
Administration of Rules
734–051–1040
Relationship to Local Jurisdiction Rules and Regulations
734–051–1050
Procedure to Obtain a Permit to Construct or Modify a Public Approach
734–051–1060
Delegation of Permit Authority to Local Jurisdiction
734–051–1065
Restriction of Turning Movements for Existing Private Approaches
734–051–1070
Definitions
734–051–2010
Rights of Access — General Provisions
734–051–2020
Grants of Access
734–051–2030
Indentures of Access
734–051–3010
Administration of Private Approaches — Permit for Private Approach
734–051–3015
Presumption of Written Permission for an Existing Private Connection
734–051–3020
Change of Use of a Private Connection
734–051–3030
Application Requirements for State Highway Private Approach
734–051–3040
Private Approach Permit Application Review, Approvals and Timelines
734–051–3050
Deviations from Approach Spacing, Sight Distance, and Channelization Standards for a Private Approach
734–051–3060
Pre-Decision Collaborative Discussion for Highway Approach Permit Applications
734–051–3070
Mitigation Measures
734–051–3080
Post-Decision Review Processes
734–051–3090
Post-Decision Collaborative Discussion
734–051–3100
Access Management Dispute Review Board
734–051–3110
Contested Case Hearing Process
734–051–4010
Access Management Standards for Approaches — General Provisions
734–051–4020
Standards and Criteria for Approval of Private Approaches
734–051–4030
Benefit to the State Highway System
734–051–4040
Temporary Approaches
734–051–4050
Special Use Approaches
734–051–5010
Approach Design and Construction — Design of Approaches
734–051–5020
Issuance of Construction Permits
734–051–5030
Construction of Approaches
734–051–5040
Effective Period of Construction Permits
734–051–5050
Responsibility for Costs of Construction of Approaches
734–051–5060
Liability, Insurance and Bonding Requirements
734–051–5070
Review Procedure for Modifying a Construction Permit
734–051–5080
Issuance of a Permit to Operate, Maintain and Use an Approach
734–051–5090
Maintenance of Approaches
734–051–5100
Effective Period of Permit to Operate, Maintain and Use an Approach
734–051–5110
Revocation of Permits and Removal of Approaches
734–051–5120
Access Management in Project Delivery
734–051–6010
Remedies in Closure of Approaches — Authority and Purpose of OAR 734-051-6010 through 734-051-6060
734–051–6020
Definitions
734–051–6030
Offer of Remedies
734–051–6040
Procedure for Resolving Claims
734–051–6050
Appraisals
734–051–6060
Conditions of Agreement
734–051–6070
Delegation
734–051–7010
Access Management in Highway Facility Plans
Last Updated

Jun. 8, 2021

Rule 734-051-5030’s source at or​.us