OAR 918-225-0615
Inspection of Minor Repair Permits
(1)
The division will randomly inspect at least one permit from each lot of minor repair permits(2)
The division will initially select one minor repair permit from each lot for inspection. If the division determines that the work done under the first permit does not comply with the Oregon Boiler and Pressure Vessel Specialty Code, the division will inspect a second permit from the same lot. If the division determines that the work done under the second permit is also non-compliant, the division will individually inspect all remaining permits from the same lot.(3)
The purchase price for each lot of minor repair permits includes the fee for one inspection. The division will charge for any additional inspections at its hourly inspection rate.(4)
If the division determines that work performed under a minor repair permit did not comply with the Oregon Boiler and Pressure Vessel Specialty Code, the division will require corrections to bring the boiler or pressure vessel into code compliance. Such corrections may not be performed under a minor repair permit. Installation permit and inspection requirements apply.(5)
Work performed under a minor repair permit that is not randomly inspected in accordance with this rule will be inspected during the boiler or pressure vessel’s next regularly scheduled inspection.
Source:
Rule 918-225-0615 — Inspection of Minor Repair Permits, https://secure.sos.state.or.us/oard/view.action?ruleNumber=918-225-0615
.