OAR 918-674-0155
State Fees
(1)
Filing Fee: Registration as a prefabricated structure manufacturer:(a)
Each manufacturer or each plant manufacturing three or more relocatable structures per year $100;(b)
Annual renewal of registration $20;(c)
Administration fee for change of name, ownership or location of manufacturing facility $20.(2)
Additional Fee for Travel to Out-of-State Inspections:(a)
Commercial travel shall be charged at the actual cost for bus, rail, air or ferry fare;(b)
Cost of food, lodging, car rental, parking and other reimbursable costs shall be charged at the rate established for per diem allowance set by the State of Oregon for State Employees;(c)
Out of state travel fees begin at the Oregon border or at the point of departure by commercial transportation.(3)
Plan Review Fees:(a)
Plan review fees except for plumbing and mechanical plan review, and the hourly design option plan review, shall be based upon Table 1-PF or Table 2-PF; Table 1-PF shall be used for all custom plan review fees and Table 2-PF for all design master plan review fees;(b)
The Division structural plan review fee shall not exceed the Table 1-PF (custom plans) or Table 2-PF (design master plans) fees for 65 percent of the building valuation. The local authority having jurisdiction’s structural plan review fee for foundations and all other site work shall be based on the valuation of the work performed on site;(c)
The Division fire and life safety plan review fee shall not exceed the Table 1 (custom plans) or Table 2 (design master plans) fees for 40 percent of the building valuation. The local authority having jurisdiction’s fire and life safety plan review fee shall be based on the valuation of the work performed on site;(d)
The plumbing plan review fee shall be 30 percent of the fee adopted in the Oregon Plumbing Specialty Code;(e)
The mechanical plan review fee shall be 25 percent of the fee adopted in the Oregon Mechanical Specialty Code;(f)
The hourly fee for design option plan review shall be $60 per hour;(g)
The fee for renewal of design master plans and design options previously reviewed and approved shall be 50 percent of the initial plan review fees;(h)
The fee for additional review of plans required by changes, addition or revisions shall be 50 percent of the initial plan review fees;(i)
An administrative fee of $100 shall be charged for transfer of approved plans to another manufacturer;(j)
The fee for resubmission of plans that have expired or been revoked, shall be 100 percent of the appropriate plan review fee;(k)
An administrative fee of $60 shall be charged for filing a Notice to Local Enforcement Agency;(l)
The valuation used to calculate plan review fees for subsections (a), (b) and (c) of this section shall be based on the Division’s published valuation table or when approved by the Division, the invoice price, FOB factory, of the prefabricated structure;(m)
Design master plan approval fees shall be 100 percent of the plan review fees in this section of rule for one year, 150 percent of the fees in this section of rule for two years and 200 percent of the fees in this section of rule for three years. The annual renewal of design master plans shall be 50 percent of the fees in this section of rule.(4)
Manufacturer’s Compliance Assurance Fees:(a)
To review manufacturing facility compliance control manual = $400;(b)
For resubmission of a compliance control manual that has been revoked or not approved = $200;(c)
To transfer a compliance control program = $100;(d)
For inplant and field evaluation or audit of a compliance control program = $60 per hour.(5)
Permit, Inspection and Service Fees:(a)
The Division fee for a permit for each prefabricated structure other than components, shall be computed at the rate of $60 per hour, but shall not exceed the fees in Table 1-PF;(b)
The Division permit fee for component buildings shall not exceed Table 1-PF for 35 percent of the building valuation. The local authority having jurisdiction’s permit fee for component building installations and all site work shall be based on the valuation of the work performed on site;(c)
The Division permit fee for prefabricated sandwich panels shall be $.03 per square foot of the total surface area for all panels erected. This fee shall be remitted to the Division within one month of the time the structure is erected at the building site. The local authority having jurisdiction’s site inspection permit fee shall be based on the valuation of the work performed on site;(d)
The Division permit fee for building components not identified in subsections (b) and (c) of this section shall not exceed the Table 1-PF fees for 35 percent of the building valuation. The local authority having jurisdiction’s permit fee for building component installations and all site work shall be based on the valuation of the work performed on site;(e)
Any required reinspection shall be charged at the rate of $60 per hour not to exceed the fees in Table 1-PF for 50 percent of the building valuation;(f)
A fee of $19.50 per hour shall be charged for technical consultation, with a minimum charge of one hour;(g)
For an occupancy not found in OAR 918-460-0030 (Fees for Plan Review and Permits) Table 2-S, use subsection (h) of this section to calculate permit fees;(h)
The valuation used to calculate permit fees for subsections (a), (b), (c) and (d) of this section may be based on the Division’s published valuation table or when approved by the Division, the invoice price, FOB factory, of the prefabricated structure.(6)
Insignia of Compliance Fees:(a)
For the first section or module $50;(b)
For each additional section or module $35;(c)
For building components and service cores $50.(7)
Third-party agency fees:(a)
Certification application review fee: $400;(b)
Certification renewal fee: $200;(c)
Certification amendment fee: $60;(d)
Application for recertification fee: $400;(e)
Monitoring fee: $60 per hour.(8)
Other Inspection Fees:(a)
A special inspection fee shall be paid before a permit is issued for work started without a permit. The special inspection fee shall be equal to and in addition to the amount of the permit fee required by these rules;(b)
In addition to the called for inspections, the authority having jurisdiction may make or require additional inspections to insure compliance with the provisions of Oregon law, Oregon Specialty Codes and administrative rule;(c)
A reinspection fee may be assessed for each inspection or reinspection when the work for which an inspection is called is not complete or when required corrections are not made;(d)
The Division’s plan review or permit fees collected for the initial construction and installation of each prefabricated structure shall not exceed 100 percent of rates in Tables 1-PF or Table 2-PF except for incomplete structures or rework requiring additional inspections or plan reviews.