ORS 758.125
Duties and rights not altered by ORS 758.120


(1)

ORS 758.120 (Electric easement in provision of broadband services) does not alter the rights of an electric cooperative or commercial broadband service provider to acquire the rights to use real property for broadband services through any other means authorized by law.

(2)

ORS 758.120 (Electric easement in provision of broadband services) does not authorize an expanded use that is expressly prohibited by the terms of a written electric easement.

(3)

Exercise of the authority granted in ORS 758.120 (Electric easement in provision of broadband services) does not:

(a)

Change the legal relationship between the electric cooperative as the easement holder and the property owner;

(b)

Create an easement right for any third party, including but not limited to a commercial broadband service provider or a broadband division or affiliate of the electric cooperative; or

(c)

Expand the footprint of the existing easement.

(4)

An expanded use of an electric easement authorized under ORS 758.120 (Electric easement in provision of broadband services) may not alter or interfere with any easement rights held by parties other than the electric cooperative that existed, within or outside the area of the electric easement, prior to the expanded use.

(5)

Intentionally left blank —Ed.

(a)

Nothing in ORS 758.120 (Electric easement in provision of broadband services) requires an electric cooperative that does not have a broadband division or affiliate to offer or authorize the access or use of an electric easement or to use attachments or electric service infrastructure owned or controlled by the electric cooperative for provision of broadband services in a manner that would, in the electric cooperative’s reasonable discretion, materially interfere with the electric cooperative’s construction, maintenance or use of any electric cooperative attachments or infrastructure for the provision of electric service.

(b)

Subject to subsection (2) of this section, if an electric cooperative has a broadband division or affiliate, the electric cooperative may withhold authorization for a commercial broadband service provider to access or use an electric easement or to use attachments or electric service infrastructure owned or controlled by the electric cooperative for provision of broadband services only if:

(A)

There is insufficient capacity for attachments necessary for the provision of broadband service; or

(B)

Concerns of safety or reliability or generally applicable engineering purposes weigh against granting the authorization.

(6)

Nothing in this section or ORS 758.120 (Electric easement in provision of broadband services) imposes any duty or liability on a property owner in addition to any liability provided for in an electric easement for unintentional damage by the property owner to facilities necessary for the provision of broadband that are installed in an electric easement pursuant to an expanded use authorized under ORS 758.120 (Electric easement in provision of broadband services). An electric cooperative that exercises the authority granted under ORS 758.120 (Electric easement in provision of broadband services) shall indemnify and hold harmless the property owner against damage to existing easement holders resulting from activities related to the installation or maintenance of facilities described in this subsection. [2021 c.149 §2]
Note: See note under 758.120 (Electric easement in provision of broadband services).

Source: Section 758.125 — Duties and rights not altered by ORS 758.120, https://www.­oregonlegislature.­gov/bills_laws/ors/ors758.­html.

758.010
Authority to construct lines and facilities
758.012
Notice of intent to build transmission line to consumer-owned utilities and public utilities
758.013
Operator of electric power line to provide Public Utility Commission with safety information
758.015
Certificate of public convenience and necessity
758.017
Appeal of grant or denial of certificate of public convenience and necessity for transmission lines subject to Energy Facility Siting Council approval
758.020
Joint occupancy of poles
758.025
Relocation of utilities in highway right of way
758.035
Commission’s power to enforce joint use of facilities
758.120
Electric easement in provision of broadband services
758.125
Duties and rights not altered by ORS 758.120
758.130
Requirements for electric cooperative in provision of broadband services
758.210
Policy
758.215
Definitions for ORS 758.210 to 758.270
758.220
Authority for conversion to underground facilities
758.225
Petition, ordinance or resolution for conversion
758.230
Assessment procedure
758.235
Applicability of local improvement laws
758.240
Contract with utility for conversion
758.245
Payment of costs for conversion
758.250
Conversion of facilities on private lands
758.255
Discontinuance of utility service for noncompliance with conversion provisions
758.260
Competitive bidding for utility conversion
758.265
Overhead facilities in assessment district after conversion
758.270
Effect of ORS 758.210 to 758.270 on existing laws and rights
758.280
Definitions for ORS 758.280 to 758.286
758.282
Immunity of electric utility for pruning or removing vegetation in certain cases
758.284
Immunity of electric utility for pruning or removing vegetation in other cases
758.286
Immunity not applicable to liability for cost of abating fires
758.300
Definitions for ORS 758.300 to 758.320
758.302
Application for exclusive service territory
758.305
Exclusive service territories
758.310
Assignment or transfer of rights in exclusive service territory
758.315
Water utility service provided by persons not designated by commission
758.320
Application of ORS 758.300 to 758.320 to cities
758.400
Definitions for ORS 758.015 and 758.400 to 758.475
758.405
Purpose of ORS 758.400 to 758.475
758.410
Contracts for allocation of territories and customers
758.415
Enforceability of contract approved by commission
758.420
Filing of contract
758.425
Order of commission on contract
758.430
Amendment of contract
758.435
Application for allocation of territory
758.440
Order of commission on application
758.445
Judicial review of order on application
758.450
Contract required for allocation of territory
758.455
Investigation by commission respecting contracts or applications
758.460
Assignment or transfer of rights acquired by allocation
758.465
Enforcement procedure
758.470
Application to cities, municipalities and cooperatives of ORS 758.400 to 758.475
758.475
Fees
758.480
Assumption of obligations arising out of Trojan Nuclear Plant
758.505
Definitions for ORS 758.505 to 758.555
758.515
Legislative findings
758.525
Avoided cost schedules
758.535
Criteria for qualifying facility
758.545
Electric utility required to make good faith effort to transmit energy
758.552
Ownership of renewable energy certificates for energy generated by qualifying facility
758.555
Effect of energy sales on qualifying facility
Green check means up to date. Up to date