ORS 758.215
Definitions for ORS 758.210 to 758.270


As used in ORS 758.210 (Policy) to 758.270 (Effect of ORS 758.210 to 758.270 on existing laws and rights), unless the context requires otherwise:

(1)

“Convert,” “converting” or “conversion” means the removal of overhead electric or communication facilities and the replacement thereof with underground electric or communication facilities at the same or different locations.

(2)

“Electric or communication facilities” means any works or improvements used or useful in providing electric or communication service, including but not limited to poles, supports, tunnels, manholes, vaults, conduits, pipes, wires, conductors, guys, stubs, platforms, crossarms, braces, transformers, insulators, cutouts, switches, capacitors, meters, communication circuits, appliances, attachments and appurtenances, and all related facilities required for the acceptance of electric or communication services; however:

(a)

“Electric facilities” does not include any facilities used or intended to be used for the transmission of electric energy at nominal voltages in excess of 35,000 volts.

(b)

“Communication facilities” does not include facilities used or intended to be used for the transmission of intelligence by microwave or radio, apparatus cabinets or outdoor public telephones.

(c)

“Electric or communication facilities” does not include any electric or communication facilities owned or used by or provided for a railroad or pipeline and located upon or above the right of way of the railroad or pipeline.

(3)

“Landowner” or “owner” means the owner of the title to real property or the contract purchaser of real property of record as shown on the last available complete assessment roll in the office of the county assessor.

(4)

“Overhead electric or communication facilities” means electric or communication facilities located above the surface of the ground.

(5)

“Public authority” means a city or county.

(6)

“Public lands and right of way” includes rights of way for streets, roads and highways and all land or interests in land owned by a public authority.

(7)

“Underground assessment district” or “district” means an assessment district created as provided by ORS 758.210 (Policy) to 758.270 (Effect of ORS 758.210 to 758.270 on existing laws and rights).

(8)

“Underground electric or communication facilities” means electric or communication facilities located below the surface of the ground exclusive of those facilities such as substations, transformers, pull boxes, service terminals, pedestal terminals, splice closures, apparatus cabinets and similar facilities which normally are above the surface in areas where utility facilities are underground in accordance with standard underground practices.

(9)

“Utility” means any electric or communication utility described by ORS 757.005 (Definition of public utility) or any telecommunications utility described by ORS 759.005 (Definitions), any plant owned or operated by a municipality, any person furnishing community antenna television service to the public and any cooperative corporation or people’s utility district engaged in furnishing electric or communication service to consumers. [1969 c.385 §2; 1971 c.360 §1; 1987 c.447 §100]

Source: Section 758.215 — Definitions for ORS 758.210 to 758.270, https://www.­oregonlegislature.­gov/bills_laws/ors/ors758.­html.

758.010
Authority to construct lines and facilities
758.012
Notice of intent to build transmission line to consumer-owned utilities and public utilities
758.013
Operator of electric power line to provide Public Utility Commission with safety information
758.015
Certificate of public convenience and necessity
758.017
Appeal of grant or denial of certificate of public convenience and necessity for transmission lines subject to Energy Facility Siting Council approval
758.020
Joint occupancy of poles
758.025
Relocation of utilities in highway right of way
758.035
Commission’s power to enforce joint use of facilities
758.120
Electric easement in provision of broadband services
758.125
Duties and rights not altered by ORS 758.120
758.130
Requirements for electric cooperative in provision of broadband services
758.210
Policy
758.215
Definitions for ORS 758.210 to 758.270
758.220
Authority for conversion to underground facilities
758.225
Petition, ordinance or resolution for conversion
758.230
Assessment procedure
758.235
Applicability of local improvement laws
758.240
Contract with utility for conversion
758.245
Payment of costs for conversion
758.250
Conversion of facilities on private lands
758.255
Discontinuance of utility service for noncompliance with conversion provisions
758.260
Competitive bidding for utility conversion
758.265
Overhead facilities in assessment district after conversion
758.270
Effect of ORS 758.210 to 758.270 on existing laws and rights
758.280
Definitions for ORS 758.280 to 758.286
758.282
Immunity of electric utility for pruning or removing vegetation in certain cases
758.284
Immunity of electric utility for pruning or removing vegetation in other cases
758.286
Immunity not applicable to liability for cost of abating fires
758.300
Definitions for ORS 758.300 to 758.320
758.302
Application for exclusive service territory
758.305
Exclusive service territories
758.310
Assignment or transfer of rights in exclusive service territory
758.315
Water utility service provided by persons not designated by commission
758.320
Application of ORS 758.300 to 758.320 to cities
758.400
Definitions for ORS 758.015 and 758.400 to 758.475
758.405
Purpose of ORS 758.400 to 758.475
758.410
Contracts for allocation of territories and customers
758.415
Enforceability of contract approved by commission
758.420
Filing of contract
758.425
Order of commission on contract
758.430
Amendment of contract
758.435
Application for allocation of territory
758.440
Order of commission on application
758.445
Judicial review of order on application
758.450
Contract required for allocation of territory
758.455
Investigation by commission respecting contracts or applications
758.460
Assignment or transfer of rights acquired by allocation
758.465
Enforcement procedure
758.470
Application to cities, municipalities and cooperatives of ORS 758.400 to 758.475
758.475
Fees
758.480
Assumption of obligations arising out of Trojan Nuclear Plant
758.505
Definitions for ORS 758.505 to 758.555
758.515
Legislative findings
758.525
Avoided cost schedules
758.535
Criteria for qualifying facility
758.545
Electric utility required to make good faith effort to transmit energy
758.552
Ownership of renewable energy certificates for energy generated by qualifying facility
758.555
Effect of energy sales on qualifying facility
Green check means up to date. Up to date